My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 1:18:05 PM
Creation date
6/3/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2012-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> DEC 16 2015 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING ENVIRONMENTAL <br /> Test Method Developed By: ❑UDC Manufacturer El Industry Standard ❑ProfWAlJf1TMEN <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> 730" 730" <br /> UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" <br /> Height from UDC Bottom to Top 10" 10" 10" 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5• 5' 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Fair Fair Fair Fair <br /> Portion of UDC Tested Above highest penetration Above highest penetration Above highest penetration Above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A N/A N/A <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No 0 NA ❑Yes ❑No p NA ❑Yes ❑No m NA ❑Yes ❑No p NA <br /> safe shutdown?` <br /> Was fail-safe verified to be ❑Yes ❑No p NA ❑Yes ❑No p NA ❑Yes ❑No ®NA ❑Yes ❑No 21 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 12:42pm Visual Fail Visual Fail 12:42pm <br /> Initial Reading (RI): 4.3549 Inches Inches Inches 0.3301 Inches <br /> Test End Time: 12:57pm 12:57pm <br /> Final Reading(RF): 4.3549 Inches Inches Inches 0.3301 Inches <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading(RF-R�): 0.0000 0.0000 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: p Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail p Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA p Yes ❑No ❑NA p Yes ❑No ❑NA <br /> Was sensor properly replaced and [Z]Yes ❑No ❑NA ❑Yes ElNo ElNA [Z]Yes ❑No ❑NA p Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for Jailed tests) <br /> UDC'S 3/4 & 5/6 Visual Fails - lost 6" water in 15 min - need to replace penetrations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.