Laserfiche WebLink
RECEIVED <br /> SWRCB,January 2002 D E CPaL 201%f <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ ENVIROMMETIN IML <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested❑ HEAtTH DEPARTMENT <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ✓❑Industry Standard []Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑✓ Other(Spec) inches-1 hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: a&e.-i hr W.-Ile! <br /> Spill Box#FB 87 Spill Box#FB 91 Spill Box#VB 87 Spill Box#VB 91 <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 14.5" 15" 15.5" 15.5' <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:01am 10:01am 10:01am 10:01am <br /> Initial Reading(RI): 14 inches-i h,visual lest 14.75 inches-t h,Wsesl teal 15.25 inches-i h,Visual lest 15 Inches-,b sit <br /> Test End Time: 11:01 am 11:01 am 11:01 am 11:01 am <br /> Final Reading(RF): 14 nnhas-I hr isualWe( 14.75 inches-1 c, nes! 15.25 inches-,h,imalWel 15 yes-,hr sual <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0.00 0.00 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: Q Pass El Fail I Q✓ Pass ❑Fail Q Pass El Fail t[Z]Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />