My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 1:18:05 PM
Creation date
6/3/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231766_4344 E WATERLOO_2012-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j Av'I <br /> 5. SECONDARY PIPE TESTING 1 <br /> Test Method Developed By: ❑Piping Manufacturer FZ]Industry Standard ❑Profe <br /> �-1-M 1 1 <br /> []Other(Specify) <br /> Test Method Used: FZ]Pressure E]Vacuum F1 Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> IMEEMPiping Run#877 Piping Run#91 Piping Run# iping Run# <br /> Piping Material: <br /> Piping <br /> Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter 3" 3" <br /> Length of Piping Run: Appx 175' Appx 175' <br /> Product Stored: 87 91 <br /> Method and location of Test Boot in Sump Test Boot in Sump Test Boot in Sump Test Boot in Sump <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:13am 10:13am <br /> Initial Reading(RI): 5 PSI 5 PSI PSI PSI <br /> Test End Time: 11:13am 11:13am <br /> Final Reading(RF): 5 PSI 5 PSI PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: El Pass El Fail ElPass ElFail OPass E]Fail []Pass E]Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.