Laserfiche WebLink
I V <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING JAN <br /> Test Method Developed By: E]UDC Manufacturer El Industry Standard F1 Profe"(W <br /> (Spec)c ify) 'Yk-t r,�M_m A A <br /> ❑Other( M K!E N <br /> Test Method Used: ❑Pressure E]Vacuum JZI Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 10,, 10" 101, 10" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5.1 5" 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested' Above highest penetration Above highest penetration Above highest penetration Above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A N/A N/A <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- 0 Yes 0 No 0 NA 0 Yes El No IONA 0 Yes 0 No IZI NA r7l Yes 0 No [71 NA <br /> safe shutdown?* <br /> Was fail-safe verified to be 2 Yes E]No [2]NA El Yes n No 171 NA 0 Yes [I No IZI NA F1 Yes El No [Z]NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 12:42pm Visual Fail Visual Fail 12:42pm <br /> Initial Readin (Ri): 4.3549 Inches Inches Inches 0.3301 Inches <br /> Test End Time: 12:57pm 12:57pm <br /> Final Reading(RF): 4.3549 Inches Inches Inches 0.3301 Inches <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading(RF-R,): 0.0000 0.0000 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: 2 Pass Fl Fail [] Pass []Fail C] Pass []Fail 2 Pass []Fail <br /> Was sensor removed for testing? 0 Yes 0 No El NA ZI Yes 0 No El NA 171 Yes El No E]NA Z Yes []No Ej NA <br /> Was sensor properly replaced and [21 Yes El No []NA (Z Yes E]No n NA Z Yes E]No E]NA Z Yes E]No Fl NA <br /> verified functional after test <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> UDC'S 3/4 & 5/6 Visual Fails - lost 6" water in 15 min - need to replace penetrations. <br />