Laserfiche WebLink
SWRCB,January 2002 ag <br /> ft LJ <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment BoxesEl JAW I i LL6 <br /> Spill/Overfill Containment Boxes are Present,but were Not TestedEl <br /> Test Method Developed By: El Spill Bucket Manufacturer R1 Industry Standard ❑Profess;W� ! <br /> El Other(Specify) <br /> Test Method Used: El Pressure 0 Vacuum []Hydrostatic <br /> 0 Other(Specify) inches-I hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: in« s-1 hr i—1 <br /> Spill Box#1713 87 Spill Box#FB 91 Spill Box#VB 87 Spill Box#VB 91 <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 14.5" 151, 15.5" 15.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 10:01 am 10:01 am 10:01 am 10:01 am <br /> Initial Readi g(Rj): 14 orches-,h,vi—lest 14.75 15.25 mch- I h,vi.M 15 1— 1h,mm I <br /> Test End Time. 11:01 am 11:01 am 11:01 am 11:01 am <br /> Final Reading(RF): 14 1 hr iwal W,t 14.75 i^che, I hr vi..W W. 15.25 Inches1—m— 15 ;^^h.-1 h,m.N <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0.00 0.00 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: I <br /> Test Result 11 RIPass Elfail El Pass ElFail QPass RIPass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />