Laserfiche WebLink
9 REGEIVE0 <br /> F.In-Tank Gauging/SIR Equipment: Fe Check this box if tank gauging is used only for inventory c.,rkh N 0 7 7 0 16 <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> "P* <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. ONMNA EN <br /> V!R <br /> Complete the following checklist: <br /> • Yes r No- Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes r No- Nere all tank gauging probes visually inspected for damage and residue buildup? <br /> r Yes r No- as accuracy of system product level readings tested? <br /> r Yes r No- as accuracy of system water level readings tested? <br /> r Yes r No- Were all probes reinstalled properly? <br /> Yes No- ere all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> G Yes No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> I N/A apply)Simulated leak ratelVe 3 g.p.h.; f—0.1 g.p.h; i"0.2 g.p.h. <br /> ro Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> G Yes No* Was the testing apparatus properly calibrated? <br /> * Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> JrO N/A <br /> * Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r N/A <br /> * Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> r N/A monitoring system is disabled or disconnected? <br /> * YesNo* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> monitoring system malfunctions or fails a test? <br /> N/A <br /> ro Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> r N/A <br /> ro Yes r No* lWere all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />