Laserfiche WebLink
This Hazardous Materials Management Plan (HMMP) has been prepared <br />in accordance with the California Administrative Code, Title 23 <br />Water, Chapter 3 Water Resources Control Board, Subchapter 16 <br />Underground Tank Regulations regulating the storage of hazardous <br />substances in underground tanks. It pertains to the storage and <br />handling of diesel fuel at the Pacific Bell Lodi Central Office <br />at 124 West Elm Street, Lodi, CA 95240. <br />The facility is equipped with a standby power generator which is <br />driven by a diesel fuel fired engine. The fuel is stored in an <br />underground tank with a nominal capacity of 2,000 gallons. The <br />generator is normally operated approximately once every month for <br />a duration of one to two hours. This HMMP is designed for the <br />early detection and containment of diesel fuel leaks or spills. <br />This document has been <br />Sacramento, California. <br />Prepared by: <br />prepared by L.B.M.E. Corporation of <br />Bruce L. Cameron <br />L.B.M.E. Corporation <br />3814 Auburn Blvd., Suite 62 <br />Sacramento, CA 95821 <br />(916) 972-9010 <br />Reviewed by: <br />mes J. Elder <br />ivil Engineer <br />L.B.M.E. Corporation <br />3814 Auburn Blvd., Suite 62 <br />Sacramento, CA 95821 <br />(916) 972-9010 <br />Date <br />10 - Z 3 -r(. <br />Date <br />cj <br />No. 14600 <br />`ti,, OF Cr, <br />