My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:59:43 PM
Creation date
6/3/2020 9:53:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.e <br /> Introduction Dualoy 3000/L contained piping systems <br /> Dualoy 3000/L secondary containment systems are designed to enclose UL and ULC- <br /> listed Ameron primary piping used in product lines,vent lines and vapor recovery lines <br /> from the pump discharge at the product storage tank to the shear valve at the <br /> dispenser.Containment systems employ pipe one size larger than the primary and <br /> specially designed fittings that provide complete enclosure of primary piping.Dualoy <br /> containment systems are designed for dose make-up and ease of installation.Contact <br /> Ameron Fiberglass Pipe Division for assistance in designing containment systems. <br /> Dualoy 3000/L non-contained piping systems <br /> Detailed installation instructions for Dualoy 3000/L single-wall piping systems may be <br /> found in Ameron publication Bulletin 7501 (FP104)available from Ameron Fiberglass <br /> Pipe Division or your Ameron distributor. <br /> Fig.1-1.A typical three-product service I <br /> station layout employing Dualoy 3000/1- <br /> fiberglass <br /> 000/Lfiberglass pipe for product piping and <br /> Stage I and Stage II vapor recovery lines. <br /> Dualoy 3000/L piping is also available for <br /> the complete line of secondary <br /> containment systems. <br /> I <br /> I <br /> Listings and approvals Dualoy 3000/L is listed in the U.S.with Underwriters Laboratories for nonmetallic <br /> underground piping for petroleum products,gasoline-alcohol blends,alcohols and <br /> oxygenated fuels for both primary(File MH9162)and containment(File MH15596) <br /> piping systems.Dualoy 3000/L pipe and fittings are also listed with Underwriters <br /> OUnderwriters <br /> Laboratories of Canada for petroleum products and alcohols(File CMH 715),in <br /> Laboratories Inc.. C Sweden with AB Statens Anlaggningsprovning(Certifikat SA 1-1-9846),and in The <br /> L Netherlands with KIWA(Ref.ATA no.2062/1-E).Dualoy 3000/L piping systems <br /> conform to the requirements of Arret6 261 bis(French Ministry of the Environment).In <br /> Great Britain the Dualoy 3000/L system has been tested and accepted by the London <br /> Fire and Civil Defence Authority. <br /> On-site inspection Inspection <br /> and storage <br /> Primary piping inspection is especially critical on double-wap installations.Shipping <br /> or handling damage is not visible once the primary has been contained.Damaged <br /> pipe can be identified by localized discoloration,crazing and deep scratches or <br /> gouges.Refer to Ameron Bulletin 7501 for guidelines on inspection,handling and <br /> storage.Inspect containment piping and fittings for damage. <br /> Storage <br /> Dualoy 3000/L pipe incorporates a 5-mil thick,resin-rich reinforced outer coating which <br /> provides outstanding UV resistance.Pipe stored out of doors for extended periods may <br /> assume a chalky appearance.This change in appearance is superficial and does not <br /> affect the pipe's performance.Protect stored pipe from impact damage by stacking on <br /> padded racks.Have ample supplies of nuts,bolts and washers or rivets and adhesive on <br /> hand before starting installation. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.