My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:59:43 PM
Creation date
6/3/2020 9:53:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> e <br /> Dry fitting secondary containing short nuns <br /> containment systems For primary runs under four feet in length,a standard 14-inch containment coupling <br /> (cont.) and short pipe nipples can be substituted for 3'h-inch containment piping. <br /> L< 4e <br /> 14 -•- e l <br /> Fig.7-10.Contain short runs with a <br /> standard containment coupling and <br /> short containment pipe nipples. <br /> Containing crossovers and very short runs <br /> Make crossovers by using 45°elbows and tees in both primary and containment.In <br /> this way a minimum 4-inch vertical clearance can be provided between the lines.Limit <br /> the length of containment <br /> Containment Anipples at crossovers and <br /> 45•elbow �,,';, 0+1112 other very short runs to the <br /> ` \ face-to-face distance <br /> O /`y between the secondary <br /> fittings plus 1'h inches in <br /> Fig.7-11. At crossovers and very short - p order CO allow sufficient <br /> runs where even a containment half- �j space to move the <br /> coupling cannot be included,cut the / <br /> containment pipe so that a minimum min containment nipple while <br /> 3la-inch insertion depth in the t working on the primary. <br /> containment fittings is maintained. This length will provide an <br /> + insertion depth of%inch of <br /> pipe in the containment <br /> Containment tee fittings. <br /> Centralizers <br /> Centralizers are not required in Dualoy 3000/L containment systems unless in-pipe <br /> detection lines have been specified by the owner.In such cases,contact Ameron for <br /> availability. <br /> Take care not to allow stones and backfill to enter the annular space between primary <br /> and containment as this may result in leaks. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.