My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 12:59:43 PM
Creation date
6/3/2020 9:53:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1, <br /> 12 Repair procedures Repairing non-contained primary piping <br /> Refer to Ameron Bulletin 7501 for detailed instructions concerning the repair of <br /> primary piping in non-contained systems <br /> Repairing contained primary piping <br /> The 2-inch Dualoy repair coupling is sized so that it can be contained with 4-inch <br /> Dualoy 3000/L pipe.Thus,when repairing primary pipe contained within 3-inch <br /> standard containment pipe or 31b-inch containment pipe, replace the containment <br /> pipe with a 4-inch containment nipple.Join the 4-inch replacement nipple to the <br /> existing containment pipe with the appropriate reducing couplings. <br /> r®®®®®®®®®®®®®®®®----n <br /> 1 When using wing-nuts to close the primary repair <br /> 1 coupling,align the wings exactly parallel with the line to 1 <br /> 1 maintain the clearance necessary to permit the 4-inch 1 <br /> 1 containment pipe to slip over the 2-inch repair coupling. 1 <br /> i Make this alignment before the adhesive cures. <br /> L--------------------J <br /> i <br /> i <br /> 4 x 3 inch reducing <br /> couplings <br /> 2-inch repair coming <br /> 0 0 <br /> 0 0 <br /> 0 0 0 0 <br /> 0 0 0 <br /> Fig.12-1.Refer to Bulletin 7501 for ° o o ° <br /> detailed procedures which must be Align wing-nuts parallel to pipe to permit <br /> followed for repaired primary piping to <br /> maintain its UL listing. 4•inch pipe 4-inch pipe to slip over repair coupling <br /> i <br /> L <br /> r___________________ <br /> 1 When repairing lines that have been in service and 1 <br /> i that may contain flammable fumes,do not use 1 <br /> 1 electric drills or other tools which may constitute a 1 <br /> I spark hazard near the pipe.Use only air-driven or 1 <br /> 1 manual tools for cutting and sanding. 1 <br /> L------------------J <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.