Laserfiche WebLink
Oct 25 01 11 : 19a TRIT Environmental System (9161 858-1011 p. 4 <br /> S• i Describe the method that will be utilized to purge andlor Inert the"sr <br /> 'Dry = <br /> b. TaUMVIng Haular. <br /> Name ECT <br /> Address Z55" Parr . cf a �a <br /> � R C1, oJ zip R deo <br /> Phoae No 510 1 235-— 3-7 o`f <br /> Havlar RB&tmdm!pf barred as hazardou) CA D Q a Ow O!7 3 <br /> C. T Disposal site: <br /> Name ECS <br /> Address -ZS-5- P-rr Ova CL MO-L9 zip Zip i q0_ <br /> Phone No( SI 0 ) Z 3 S -l 3 g 3 <br /> SPA Dk Of transported to a permitted TSD facwq) CI[D0oq 46 3o Z -- <br /> 8. is the eampitag Arm an Independent third parry from the contractor? YBs W N®[1 <br /> Be. �DaeL. .to de bow the soli andlor water sample(s)beneath the task and piplag Will be obtainst t <br /> r� <br /> •PANw M1 6 va eag 0.R. wlFa6/-S 1 1 <br /> L4` SCP • ' MIr�C 4� c �e�t <br /> � �w ,G C Solc <br /> h <br /> ' Cj <br /> 15 S PaSg viaSACC wl1 ba gall-a 4"C44 US/rl5 <br /> �" <br /> ( �-+t Sow L Cor <br /> NI w wa a EI1�s r1w raw rineC. K C C•t <br /> 10. Describe how the excavadon will/be backiMedr with s dtgb`ie MaWW upon nmovaL- <br /> no lei. w l �I �< { (t� wr f'A S.si�w b l e � 4 P o r°i`�►r� C5 <br /> 40 �®` <br /> Haudlcg of excavated soil- <br /> a)What material will be used to line the tank pat and cover the stockpile? <br /> D)What Will be the final destination of the excavated sto ? <br /> fwtl Iwn�i,/( n4,C.K .k C, . 1 + �f -co nn <br /> 1 aG�Ca <br /> c)ceataminated Sou Bax"dogle Waste Hunter: <br /> Name ECZ Ba�istraetet P__C�4 Dt 8 L0 01-73 <br /> Address Z S$" <br /> PhoneNo.( 5/0 'Z-SS'— 3709 <br /> pap <br /> SS?�046(Hevlsed 08!13199) S <br /> 10/25/01 THU 10:14 (T%/RIC NO 87481 11004 <br />