My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: <br /> F Check this box iftank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> F Yes F No* QHas all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> _..r <br /> 1 r Yes V f No* ,Was accuracy of system product level readings tested? <br /> Yes No* <br /> ,Was accuracy of system water level readings tested <br /> w .. <br /> Yes No* Were all probes reinstalled properly? <br /> Noequipment... v <br /> _moo, _ w�d . , d e mom... <br /> JO <br /> * 'Were all items on the manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes 3 No* ment certification was a lea simulated <br /> y <br /> For equipment start-up or annual equi f __pe : <br /> p k simulated to veri ' LLD �rformance.7(Cheek <br /> N/A ,;all that apply) Simulated Ieak rate: 1 3 g.p.h.; 0.1 g.p.h; i, 0.2 g.p.h. <br /> _. <br /> ... <br /> Yes No*Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ... <br /> Yes No* Was the testing apparatus properly calibrated? <br /> Yes is r No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak'? <br /> N/A <br /> Yes N A lFor electronic LLDs,does he turbine automatically _. t � _ <br /> . s,does t � <br /> shut off i f the LLD detects a leak? <br /> * For electronic LLDs,does the turbine automatically shut off n ..: . ... <br /> � Yes No if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> * For electronic LLDs, does the turbine automatically shut off <br /> Yes No y if any portion of the monitoring system malfunctions or <br /> €? t N/A fails a test? <br /> S t, <br /> t <br /> 0,wtrcvtar <br /> E <br /> r Yes S No For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ( N/A <br /> `i <br /> Yes No* all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section II,below,describe how and when these deficiencies were or will be corrected <br /> H. Comments: <br /> Suction System. <br />
The URL can be used to link to this page
Your browser does not support the video tag.