My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> Address: 124 W. ELM ST. LODI 95240 Service Date: 05/03/2011 <br /> F. In-Tank Gauging/SIR Equipment ®Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the fol owing checklist <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ❑Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑ No* Were all probes reinstalled properly? <br /> ❑Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H below, describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors (LLD): M Check this box if LLDs are not installed <br /> Complete the fol owina checklist <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑N/A Simulated Leak Rate(check all that apply) ❑3.0 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> ❑Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑ N/A <br /> ❑Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H below, describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> Suction system <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.