My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
124
>
2300 - Underground Storage Tank Program
>
PR0231866
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:20:31 PM
Creation date
6/3/2020 9:53:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231866
PE
2361
FACILITY_ID
FA0003957
FACILITY_NAME
AT&T California - UE020
STREET_NUMBER
124
Direction
W
STREET_NAME
ELM
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
124 W Elm St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231866_124 W ELM_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1,iEALTH & SAFETY 0 <br />2007 <br />piping,All electrical lines, . • like items knownto be associated be <br />isolated i disconnected. <br />If at anytime during the excavation,• i • of atmosphere around <br />the tank exceeds 25 percent, all •rk will cease • it proper mitii r • procedures <br />initiated. <br />111] 16111 1 0 6 11111= <br />1 • • • • • Ill H4#115k"On,` • v <br />• _ • o - • ' • • • • • - • • • • _ • <br />Any • all soil- • disposal is the sole responsibility of - client, and all soil• - <br />will /- analyzed /requirements. <br />Cl. Lock -out procedures • i • <br />Lock -out procedures must be followed during the cleaning, servicing, or adjusting of <br />machinery or electrical equipment. LOTO procedures shall be implemented as require* <br />by applicable Federal, State, or Property Owner rules and regulations. <br />includes100% fall protection shall be employed for all work at heights. Fall protection shall <br />include scaffolds, aerial lifts, and personnel hoists. Also guardrails, toe boards, and other <br />primary systems may be implemented. In addition, provisions for secondary fall protection <br />(full-body harness and fall arrest systems) shall be used for employees working or traveling <br />more than six (6) feet above a lower level and are exposed to an imminent fall hazard (this <br />• ` • conditionsr present hazardsas leading edge, open holes,and <br />skylights on building rooftops and/or other elevated towers/structures). All fall protection <br />1evices used shall be manufactured in accordance with an acceptable recognized standard <br />utilizing a design approved by a professional engineer. No job —built devices or equipment are <br />Alowed. <br />12.1 Fall arrest systems shall include: <br />11/07/2005 revision 5 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.