Laserfiche WebLink
C. Locations where monitoring is performed: (see the plot plan for physical location) <br /> Continuous monitoring and leak detection are performed: <br /> • In the interstitial space of the double wall UST <br /> • In the primary tank(by volumetric test) <br /> • In the piping sump <br /> • In the fill sump <br /> D. 1. The Site/Facility Manager is responsible for performing: <br /> • Operational monitoring <br /> • On site record keeping,Note: Onsite records are maintained on a white board mounted in <br /> the facility. And label "Facility Information Center" and contains the UST Routine <br /> Monitoring&Response Plan, Hazardous Material Business Plan and other <br /> environmental records and permits. <br /> • The reporting of any discrepancies and alarms with the monitoring system, UST,piping, <br /> and associated hardware. <br /> 2. AT&T- Environmental Management Control Center(EMCC) (California&Nevada <br /> region) at(800) 757- 6575 is responsible for all maintenance and repairs to the UST <br /> monitoring system, UST, piping, and all associated hardware. <br /> E. Reporting format: <br /> • A site fax modem with auto-dial for up to 8 phone numbers is installed to fax all <br /> alarms and warnings 24 hours a day to AT&T- Environmental Management Control <br /> Center(EMCC) (fax:925-867-0241) and to an alarm monitoring/maintenance <br /> company for alarms received by the TLS-350s. All on-site alarm are printed by the <br /> TLS-350 and maintained on site in the UST records box. <br /> • AT&T- Environmental Management Control Center uses computers with Internal <br /> Environmental Management software program for accessing/polling all facilities <br /> with Veeder Root TLS-350's three times a day, 7 days a week; for all: (1)inventory, <br /> (2) all alarms, (3) all warnings, (4) in tank leak detection, and (5) all sensors leak <br /> alarms, performing set up and programming changes, and system diagnostics with all <br /> data being stored in our database. <br /> IAHAZMAnPACBELLFORMS\AT&T Monitor Plan Merge.doc <br /> Printed:July 29,2006 page 3 <br />