My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />n <br />u <br />n <br />u <br />I 1 <br />0 <br />:l <br />[1 <br />0 <br />H <br />0 <br />AC A <br />c�ua� �cAa <br />YETI NO N/A <br />❑ ❑ ❑ <br />1. APPROVED C.PA PERMIT W/ SIGN OF. <br />Y0: ND N/A <br />❑ ❑ ❑ <br />1. CALIFORNIA STATE CONTRACTORS UCEM <br />❑ ❑ ❑ <br />2 APPROVED FIRE DEPARTMENT PERMIT W/ SIGN OFF. <br />❑ ❑ ❑ <br />2.URRRENNT)CC <br />(CU❑ 24 T IKSTMNTHAU TION/V�, <br />❑ ❑ <br />3. APPROVED BUILOING PERMIT PITH SIGN OFF. <br />.❑ ❑ ❑ <br />3. CURRENT KX1 TANK REMOVAL CERTIFHC <br />❑ ❑ ❑ <br />4. ADDITIONAL PERMITS REOUIRED W/ SIGN OFF. <br />E] E]4. <br />CMFWS URRENT TANK MDATIO COTUR <br />❑ ❑ 13 <br />& AQMD (ATC). <br />36 MONTH <br />❑ ❑ ❑ <br />6. U.S.A. EXCAVATION PERMIT NO. <br />❑ ❑ ❑ <br />5. CURRENT PIPE MANUFACTURER'S INSTAL <br />❑ ❑ ❑ <br />MOP. <br />7. AT&T MOP. <br />❑ ❑ ❑ <br />MFG'S RECDMMENDA110N OR 36 MONTH <br />S. VEDDER ROOT MONITORING SYSTEM TEE <br />❑ ❑ ❑ <br />S. SITE HEALTH & SAFETY PIAN. <br />(MUST BE MFG'S HIGHEST RANKING LE! <br />❑ ❑ ❑ <br />8. PROJECT SCHEDULE. <br />❑ ❑ ❑ <br />7. CONTRACTOR'S WORKMANSHIP WARRANT <br />❑ ❑ ❑ <br />10. 48 HOUR INSPECTION NOTIFICATIONS. <br />❑ ❑ ❑ <br />11. LETTER OF COI, PLETHON (REPAIRS ONLY). <br />�� <br />❑ ❑ ❑ <br />12 FORM "C'. <br />❑ ❑ ❑ <br />13. PERMIT EXTENSIONS <br />❑ ❑ ❑ <br />-14. ALL AGENCY CORRESPONDENCE/ W CON IRuATI0N5. <br />YES NO N/A <br />❑ ❑ ❑ <br />1. POTS UNE ORDER & SERVICE FORM. <br />__. __... - <br />❑ ❑ ❑ <br />2 ALARMS TESTED AND CONFIGURED TO P <br />TAN; AADem-mff CF.FT simm/ wAmmnm <br />❑ ❑ ❑ <br />3. WARRANTY START -TIP FORM. <br />❑ ❑ ❑ <br />4. OA/OC VEEDER ROOT CONSOLE. <br />YES Nn N/A <br />❑ ❑ ❑ <br />5. 48 HOUR INSPECTION NOTIFICATION REQ <br />❑ ❑ ❑ <br />1. TANK MANUFACTURER'S CUT SHEETS/TANK CHART. <br />❑ ❑ ❑ <br />6. SYSTEM DISCONNECT (Ems NOTIFK:ATK <br />❑ ❑ ❑ <br />2. TANK MANUF'ACTURER'S WARRANTY. <br />❑ ❑ ❑ <br />7. WARRANTY. OWNER'S. AND OPERATOR'S <br />❑ ❑ ❑ <br />& COMPLETED MANUFACTURER'S INSTALLATION CHECKUST. <br />❑ ❑ ❑ <br />S. MON17ORNG FUND CERTIFTCA71OhL <br />❑ ❑ ❑ <br />4. PIPING AMPS MANUFACTURER'S CUT SHEETS/WARRANTY- <br />❑ ❑ ❑ <br />9. OTHER <br />❑ ❑ ❑ <br />& DAY TANK MANUFACTURER'S CUT SHEETS/ TANK CHART. <br />❑ ❑ ❑ <br />S. DAY TANK MANUFACTURER'S WARRANTY. <br />M ❑ ❑ <br />7. PUMPS MANUFACIUREWS CUT SHEEIS. <br />QA/OC Ct€m <br />❑ ❑ ❑ <br />& MONITORING SYSTEM MANUFACTURER'S CUT SHEETS <br />❑ ❑ ❑ <br />9. MONITORING SYSTEM MANUFACTURER'S WARRANTIES, <br />YEs No N/A <br />❑ ❑ ❑ <br />10. HYDROSTATIC MONITORINFTI FLUID - CUT SHEETS. <br />❑ ❑ ❑ <br />1. TANK DEUVERY CHECKLIST. <br />❑ ❑ ❑ <br />11. OVERFILL ALARM MANLWAC7URER5 CUT SHEETS. <br />❑ ❑ ❑ <br />2. TANK PRESSURE CHECK AFTER SACKEI= <br />❑ ❑ ❑ <br />12. PIPE MANUFACTURER'S CUT SHEETS. <br />❑ ❑ ❑ <br />3. PRIMARY PIPING TEST PRIOR TO BACKFI <br />❑ ❑ ❑ <br />13. PIPE MAN UrACTURER'S WARRANTIES <br />❑ ❑ ❑ <br />4. SECONDARY CONTAINMENT PIPING CHE(, <br />❑ ❑ ❑ <br />5. SECONDARY CONTAINMENT PIPING CHET <br />❑ ❑ ❑ <br />14.OVERFILL/SPILL PROTECTION. <br />❑ ❑ ❑ <br />6. PIPING/TRAHSTION SUMP CHECKS. <br />❑ ❑ ❑ <br />15. TRANSITION SUMPS. <br />❑ ❑ ❑ <br />7. 48 HOUR NOTIFICATIONS <br />❑ ❑ ❑ <br />16. TIGHT -FILL FITTINGS AND ADAPTERS. <br />❑ ❑ ❑ <br />17. CHECK VALVES. <br />CLONE E AAD FSAOVAI <br />❑ ❑ ❑ IS, EXTRACTOR HOUSINGS <br />❑ ❑ ❑ <br />19. STAINLESS STEEL n.:X CONNECTORS <br />..__......._._...... <br />❑ ❑ ❑ <br />2D. CONTAINMENT FITTINGS, <br />YFS NO k/A <br />❑ ❑ ❑ <br />21. MANWAY LDS. <br />❑ ❑ ❑ <br />1. TEMPORARY CLOSURE CUPA INSPECTION, <br />❑ ❑ ❑ <br />22. DEAD MEN. <br />❑ ❑ ❑ <br />2. TEMPORARY CLOSURE DUSTO OSPECTIO[ <br />❑ ❑ ❑ <br />23. OBSERVATION S <br />❑ ❑ ❑ <br />3. VEEDER ROOT DISCONNECT NOTRICATTON <br />❑ ❑ ❑ <br />24. CDRROSON RESISTANT COATINGS. <br />❑ ❑ ❑ <br />4. APPROVAL LETTER TO BACKFILL. <br />❑ ❑ ❑ <br />25. OTHER <br />❑ ❑ ❑ <br />5. CLOSURE REPORT. <br />❑ ❑ ❑ <br />S. ALL TRANSMITTALS INCLUDING SEND /R[ <br />-___ <br />TEF3TNp AND CER FmTxm <br />❑ ❑ ❑ <br />1. 3 VANTAGE POINTS OF CONSTRUCTION STE PRIOR TO CDNSTRUCMM <br />YES NOWA <br />❑ ❑ C]2. <br />DAILY EXCAVATION. <br />[3❑ ❑ <br />1. MONITORING SYSTEM CERTIFICATION. <br />❑ ❑ ❑ <br />3. COMPLETED EXCAVATION. <br />❑ ❑ ❑ <br />2. SPILL BUCKET CERTIFICATION. <br />❑ ❑ ❑ <br />4. CONCRETE REINFORCEMENT STEEL IN PLACE FOR HDD -DOWN PAD. <br />❑ ❑ ❑ <br />3. SB -989 CEFIVICATm. <br />❑ ❑ ❑ <br />5. POURING CONCRETE HOLD-DOWN PAD. <br />❑ ❑ ❑ <br />4. PRECISION TIGHTNESS TESTS LUES <br />❑ ❑ ❑ <br />6. PLACEMENT OF PEA GRAVEL BEDDING ON SLAB. <br />❑ ❑ ❑ <br />5. EID TESTS <br />❑ ❑ ❑ <br />7. PRESSURE TESTING TANK PRIOR TO INSTALLATION. <br />❑ ❑ ❑ <br />& CATHODIC PROTECTION. <br />❑ ❑ ❑ <br />S. SETTING TANK ON PEA GRAVEL BEDDING. <br />❑ ❑ ❑ <br />7. TNTC INTEGRITY TESTING. <br />❑ ❑ ❑ <br />9. OBSERVATION WELL INSTALLATION. <br />❑ ❑ ❑ <br />B. 48 HOUR NOTIFICATIONS <br />❑ ❑ ❑ <br />10. ANCHORING TANK AND COATING ANCHOR COMPONENTS WITH <br />CORROSION RESISTANT MATERIAL <br />❑ ❑ ❑ <br />IT. PLACEMENT OF PEA GRAVEL BACKFILL TO TOP OF TANK. <br />AS-OLA_T DttAUWNM TO SOAL.E <br />❑ ❑ ❑ <br />12. INSTALLATION OF ALL PIPE RISERS AND CORROSION RESISTANT <br />COATING IF APPLICABLE. <br />s.. RED LINE ANY AND ALL CHANGES FROM THE ORIGINAL PLA <br />❑ ❑ ❑ <br />13. INSTALLATION OF PIPING SUMPS. <br />YES NO N/A <br />❑ ❑ ❑ <br />14. PIPE TRENCHES AND PEA GRAVEL BEDDING <br />❑ ❑ ❑ <br />t. TANK AND UNDERGROUND PIPING NETWO <br />❑ ❑ ❑ <br />15. PIPE INSTALLED ON PEA GRAVEL BEDDING. <br />❑ ❑ ❑ <br />L ALL APPURTENANCE IDENTIFIED ON TAN <br />❑ ❑ ❑ <br />16. EACH TRANSITION SUMP INSTALLED. <br />❑ ❑ ❑ <br />1 PIPING SCHEMATIC FOR BASEMENT. <br />❑ ❑ ❑ <br />17. PIPING SUMP AND SPILL CONTAINMENT LAKE TESTS. <br />❑ ❑ ❑ <br />4. ALL COMPONENTS OF THE FUEL SYSTEM <br />❑ ❑ ❑ <br />18. BURRING WALL PENETRATIONS FOR PIPE. <br />A SIGNIFICANT STRUCTURE ON STE. <br />❑ ❑ ❑ <br />19. BACKFILL PLACEMENT TO SUBGRADE. <br />❑ ❑ ❑ <br />& ALL UNDERGROUND UTILITIES ENCOUNIFE( <br />❑ ❑ ❑ <br />20. FINE GRADED AFFECTED AREA OF CONSRiUCTION. <br />❑ ❑ ❑ <br />21. CONCRETE REINFORCEMENT STFFJ. IN PLACE FOR SURFACE SLAB. <br />❑ ❑ ❑ <br />zz'CONCRETE POUR OF SURFACE SLA& <br />❑ ❑ ❑ <br />21 FINISHED PROJECT. <br />❑ ❑ ❑ <br />24. SERIES OF BASEMENT ENGINE ROOM PHOTOS TD ENCOMPASS ALL <br />PIPING AND VEEDFR ROOT LEAK DETECTION SYSTEM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.