Laserfiche WebLink
ENVIRONMENTAL CONSULTANT - <br />SCOPE OF WORK <br />THE FOLLOWING SCOPE OF WORK WALL BE PERFORMED BY THE ENVIRONMENTAL <br />CONSULTANT UNDER A SEPARATE CONTRACT WITH AT&T. <br />1. ATTEND (1) METHODS O PROCEDURE (MOP) MEETING AT THE SITE PRIOR TO <br />CONSTRUCTION. <br />2. TRANSPORT AND DISPOSE O FUEL PIPING IN QUANTITIES SHOWN ON <br />DRAWIN <br />GS <br />RO DIEL NAGRO - SAW AL SPED MORTAZAVI - HYDROLOGUE <br />4005 PORT CHICAGO H04WAY 2793 E FOOTHILL BLVD. <br />CA 94520 PASADENA, CA 91107 <br />(925) 298-2103 PHONE (626) 56.5-96M PRONE <br />(925) 827-20.29 FAX (626) 585- OD46 FAX <br />(925) 872-6577 CELL (6n)755-1556 CELL <br />24 HOUR EMERGENCY HOTLINE - FOR AFTER-HOURS ONLY <br />1. CONTRACTOR MUST NOTIFY ENVIRONMENTAL CONSULTANT AND CUPA AT <br />LEAST 48 HOURS IN ADVANCE TO SCHEDULE ACTIVITIES. <br />2. CONTRACTOR MUST PROVIDE A COPY OF THE REMOVAL PERMIT, TANK <br />INSTALL PERMIT (AS APPLICABLE), TO ENVIRONMENTAL CONSULTANT AT TIME <br />OF TANK REMOVAL <br />3. CONTRACTOR MUST ADVISE CONSULTANT OF 11-E MOP OR FORWARD <br />INFORMATION REGARDING ANY ACCESS CONSTRAINTS FOR TRUCKS <br />CONTRACTOR SHOULD BE ADVISED OF TIME AND LOCATION CHOSEN FOR MOP <br />MEETING AT LEAST ONE A WEEK PRIOR TO ITS SCHEDULED TIME. <br />F:\P,oj,,t\M-N-0-P\OIH\2OOM6 49AR Stockton <br />U VICINE INP <br />-wALl DIESEL STORAGE <br />LINDSAY STREET <br />• P, <br />TANK & PIPING <br />O <br />Q. <br />ar <br />o« <br />) a <br />F4 0 <br />IV LINE <br />IN BASEMENT <br />- <br />(E) TUR81N; GENERATIN2 <br />rF.WOR <br />(E FUS IMPS(TVPFIN <br />(E) PENTHOUSE <br />(E) FUEL LIKES ON ROOF <br />(E) BUILDING <br />(E) BUILDING <br />(BASEMENT & 7 STORIES) <br />CHASE <br />�0 <br />(BASEMENT & 4 STORIES) <br />0 <br />Z <br />(E) 1-1/4. 0 FOS <br />LIKE IN BASEMENT <br />- <br />PROPERTY LINE <br />•As.�,�y'� <br />SITE PLAN <br />01OVERALL <br />1• : tO-O" <br />ENVIRONMENTAL CONSULTANT - <br />SCOPE OF WORK <br />THE FOLLOWING SCOPE OF WORK WALL BE PERFORMED BY THE ENVIRONMENTAL <br />CONSULTANT UNDER A SEPARATE CONTRACT WITH AT&T. <br />1. ATTEND (1) METHODS O PROCEDURE (MOP) MEETING AT THE SITE PRIOR TO <br />CONSTRUCTION. <br />2. TRANSPORT AND DISPOSE O FUEL PIPING IN QUANTITIES SHOWN ON <br />DRAWIN <br />GS <br />RO DIEL NAGRO - SAW AL SPED MORTAZAVI - HYDROLOGUE <br />4005 PORT CHICAGO H04WAY 2793 E FOOTHILL BLVD. <br />CA 94520 PASADENA, CA 91107 <br />(925) 298-2103 PHONE (626) 56.5-96M PRONE <br />(925) 827-20.29 FAX (626) 585- OD46 FAX <br />(925) 872-6577 CELL (6n)755-1556 CELL <br />24 HOUR EMERGENCY HOTLINE - FOR AFTER-HOURS ONLY <br />1. CONTRACTOR MUST NOTIFY ENVIRONMENTAL CONSULTANT AND CUPA AT <br />LEAST 48 HOURS IN ADVANCE TO SCHEDULE ACTIVITIES. <br />2. CONTRACTOR MUST PROVIDE A COPY OF THE REMOVAL PERMIT, TANK <br />INSTALL PERMIT (AS APPLICABLE), TO ENVIRONMENTAL CONSULTANT AT TIME <br />OF TANK REMOVAL <br />3. CONTRACTOR MUST ADVISE CONSULTANT OF 11-E MOP OR FORWARD <br />INFORMATION REGARDING ANY ACCESS CONSTRAINTS FOR TRUCKS <br />CONTRACTOR SHOULD BE ADVISED OF TIME AND LOCATION CHOSEN FOR MOP <br />MEETING AT LEAST ONE A WEEK PRIOR TO ITS SCHEDULED TIME. <br />F:\P,oj,,t\M-N-0-P\OIH\2OOM6 49AR Stockton <br />U VICINE INP <br />COORDINAIM <br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL <br />WORK. <br />2. THE GENERAL CONTRACTOR SHALL RESOLVE DIFFERENCES OR DISPUTES <br />CONCERNING COORDMWTIO N, INTERFERENCE, OR EXTENT OF WORK. <br />3. USE LARGE-SCALE LAYOUT DRAWINGS OF OTHER AFFECTED WORK, TO <br />CHECK, COORDINATE AND INTEGRATE THE WORK TO PREVENT <br />INTERFERENCES <br />4. COORDINATE WORK PERFORMED BY AT&T AND OTHERS AS R INVOLVES THE <br />EXECUTION OF THIS WORK. <br />5, COORDINATE DELIVERY AND STORAGE OF AT&T FURNISHED EQUIPMENT AND <br />FUEL FOR TESTING. <br />CUTTING AND PATCHING: <br />1. PATCHING SHALL SUCCESSFULLY DUPLICATE UNDISTURBED ADJACENT FINISHES, <br />COLORS, TEXTURES AND PROFILES. <br />2. COMPLY WITH ALL LOCAL ORDINANCES AND CAL -OSHA REGULATIONS FOR <br />INDUSTRIAL SAFETY. DO NOT CUT OR ALTER STRUCTURAL MEMBERS WITHOUT <br />PRIOR WRITTEN APPROVAL OF AT&T. <br />3. PERFORM CUTTING, ASSOCIATED STRUCTURAL REINFORCING AND PATCHING IN <br />A MANNER TO PREVENT DAMAGE TO OTHER WORK AND TO PROVIDE PROPER <br />SURFACES FOR THE INSTALLATION OF MATERIALS, EQUIPMENT AND REPAIRS, <br />PERFORM DEMOLITION WORK IN SUCH MANNER AS TO PREVENT DAMAGE TO <br />EXISTING FACILITIES TO REMAIN OR TO BE SALVAGED, AND TO PREVENT <br />INJURY TO PUBLIC AND WORKERS ENGAGED ON SITE UNDER THIS OR OTHER <br />CONTRACTS. DEMOLITION DEBRIS SHALL NOT BE MOWED TO ACCUMULATE ON <br />SITE. HAZARDOUS WORK SHALL NOT BE LEFT STANDING OR FLANGING <br />OVERNIGHT OR WEEKENDS. <br />4. WHEREVER CUTTING AND REMOVAL OF PORTIONS OF EXISTING WORK 15 <br />INDICATED, SUCH WORK SMALL BE CUT IN A MANNER THAT WALL PRODUCE <br />NEAT AND STRAIGHT LINES, PARALLEL TO ADJACENT SURFACES OR PLUMB <br />FOR VERTICAL SURFACES. GRIND SMOOTH RESULTING EDGES OF CONCRETE <br />SLABS OR WALKS. <br />5. NEATLY REMOVE EXISTING FINISH MATERIALS BACK 70 CLEAN STRAIGHT LINE <br />ON NEAREST SUPPORT IN ORDER TO FACILITATE INSTALLATION O NEW <br />MATERIALS, PATCHES OR REPAIRS. EXECUTE CUTTING AND DEMOLITION BY <br />METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK AND WHICH WILL <br />PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OF REPAIRS AND NEW <br />WORK. <br />6. KEEP AREAWAYS, WALKS, CORRIDORS AND STREETS FREE OF ORT AND <br />RUBBISH. <br />7. REPAIR OR REPLACE IMPROVEMENTS DAMAGED AS A RESULT OF THIS WORK <br />AT NO ADDITIONAL EXPENSE TO AT&T. <br />S. PROVIDE WATER DAMS AND OTHER CONTAINMENT PROCEDURES, AS <br />NECESSARY, FOR CONTROLLING WATER USED FOR CONCRETE SAW CUTTING. <br />PIPING INSTALLATION NOTES <br />1. ALL FUEL OL SUPPLY, RETURN AND VENT PIPING SHALL BE INSTALLED <br />ABOVEGROUND (AS PRACTICAL). <br />2. ABOVEGROUND FUEL OL SUPPLY, RETURN AND VENT PIPING SHALL BE ASTM <br />A53 SCHEDULE 40 DOMESTIC (NORTH AMERICA) BLACK STEEL PIPE WITH <br />THREADED OR WELDED ,DINTS <br />3. ABOVEGROUND INTERIOR FUEL OL SUPPLY AND RETURN PIPING INSTALLED <br />IN AREAS WITHOUT CONTAINMENT SHALL BE INSTALLED WITH MONITORED <br />SECONDARY CONTAINMENT. <br />4. PROVIDE ADEQUATE PIPE SUPPORTS WHERE REWIRED. <br />5. INSTALL ALL PIPING THAT IS NOT SECONDARILY CONTAINED IN A MANNER <br />THAT WILL ALLOW VISUAL INSPECTION OF THE ENTIRE PIPING SYSTEM <br />INCLUDING TOP, SIDES AND BOTTOM. CHECK WITH AUTHORITY HAVING <br />JURISDICTION FOR CLEARANCE REQUIREMENTS <br />6. ALL EXPOSED PIPING SHALL BE MARKED AT INTERVALS NO GREATER THAN <br />EVERY TWENTY (20) FEET YOUTH PRODUCT COLOR -CODED DIRECTIONAL FLOW <br />ARROWS, LINES SHALL RE MARKED AT EACH CHANGE IN DIRECTION AND <br />WHERE WALL, CEILING, OR FLOOR PENETRATIONS OCCUR. IF LINES ARE <br />SHORTER THAN TWENTY (20) FEET, MARKINGS SHALL APPEAR AT LEAST <br />ONCE ALONG THEIR LENGTH. <br />7. GALVANIZED PPE OR FITTINGS SHALL NOT BE USED FOR DIESEL SERVICE. <br />8. SCOTCH KOTE ABOVEGROUND STEEL PIPING. <br />NOTE PERSUANT TO STOCCTON FIRE DEPARTMENT REQUEST; ALL PIPE WELDING <br />IS TO BE INSPECTED AND APPROVED BY A THIRD PARTY WELDING EVALUATOR. <br />ACCEPTABLE THIRD PARTY WELDING EVALUATORS ARE OSTEO AT THE FOLLOWING <br />WEBSITE: Mt4://rww.innnnl'rIe-oro/FobrkAta Ineoeetimi Prmram A.html <br />1. APPROVED PAY SNAIL BE RESPONSIBLE FOR ALL NOTIFICATIONS AND <br />SCHEDULING IN CONNECTION WITH PETROLEUM STORAGE TANK <br />REQUIREMENTS AND SHALL MAINTAIN A SITE SPECIFIC SITE SAFETY PLAN <br />DURING ALL WORK ACTIVITIES. <br />2. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EOUIPMENT AND <br />SERVICES NECESSARY FOR THE SATISFACTORY COMPLETION OF ALL WORK <br />CALLED FOR OR REQUIRED BY THE CONTRACT DOCUMENTS. <br />3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE OF FOLLOWING: <br />A LOCAL, STATE AND FEDERAL ABOVEGROUND STORAGE TANK REGULATIONS. <br />8. ADOPTED FIRE CODE. <br />C. CAL -OSHA REGULATIONS. <br />D. ADOPTED NATIONAL ELECTRIC CODE. <br />E. ALL CRY, COUNTY, AND STATE LAWS AND ORDINANCES. <br />F. PEI RP200 AS THE INDUSTRY STANDARD FOR INSTALLATION OF <br />ABOVEGROUND PETROLEUM STORAGE TANKS. <br />4. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS <br />NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING <br />FACILITIES WHICH ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS TO THE <br />SATISFACTION OF AT&T. <br />5. IT SHALL BE THE GENERAL CONT'RACTOR'S RESPONSIBILITY TO DETERMINE <br />THE EXACT LOCATION(S) AND/OR EXISTENCE OF ALL UNDER -GROUND <br />UTILITIES IN WORK AREA PR TO CONSTRUCTION WITH A PRIVATE UTILITY <br />LOCATOR. <br />6. STANTEC ARCHITECTURE INC.. UNLESS OTHERWISE DETERMINED, SHALL APPLY <br />AND PAY FOR ALL PERMITS REQUIRED FINK THE COMPLETION OF THIS <br />PROJECT. CONTRACTOR TO SUPPLY CERTIFICATE O INSURANCE, CITY <br />BUSINESS LICENSE, EVIDENCE OF CONTRACTORS UCENSE AND ANY OTHER <br />ID'ORMATION WHICH THE PERMITTING AGENCY REWIRES FROM <br />CONTRACTORS. <br />7. GENERAL CONTRACTOR SHALL L NOTIFY THE ENGINEER PROMPTLY IF SITE <br />CONDITIONS OR DIMENSIONS DISAGREE WITH INFORMATION SHOO ON THESE <br />DRAWINGS. WORK IS NOT TO PROCEED LWM SUCH DIFFERENCES ARE <br />RESOLVED. <br />8, GENERAL CONTRACTOR SHALL PROVIDE A DETAKZD METHOD OF PROCEDURE <br />M.O.P.) TO AT&T FOR APPROVAL PRIOR TO START OF CONSTRUCTION. MOP <br />INCLUDE BUILDING VENTILATION SAFETY PROCEDURES. <br />9. GENERAL CONTRACTOR SHALL SUPPLY AT&T WITH A DETAILED WORK <br />SCHEDULE MID UPDATE PROGRESS AND/OR CHANGES ON A WEEKLY BASIS. <br />10. APPROVED PAV SHALL PROVIDE THREE SETS O SUBMITTALS ON ALL <br />EQUIPMENT TO THE ENGINEER PRIOR TO START OF CONSTRUCTION. <br />11. ALL ELECTRICAL WORK TO BE DONE IN COMPLIANCE WITH CHAPTER 5, <br />ARTICLES 500-50 AND 514 OF TNR' NATIONALELECTRIC COIF. SEAT ALL <br />CONDUITS AS REWIRED UNDER THE CODE. <br />12. APPROVED PAV SHALL SUPPLY FIVE COMPLETE SETS OF OPERATION, <br />MAINTENANCE AND TEST DATA TO GENERAL CONTRACTOR. OPERATIONAL, <br />MAINTENANCE AND TEST DATA SHALL INCLUDE ALL THE ITEMS LISTED ON <br />SHEET F7 - PROJECT CLOSE-OUT DOCUMENTS AND CHECKLISTS. ALL <br />DOCUMENTS TO BE IN ACCORDANCE WITH CURRENT AT&T EMS 200 SERIES <br />PRACMES MW CHECKLISTS FOR REGULATORY BINDERS AND ON-SITE <br />BINDERS. <br />13. NEW TANKS AND PIPING SHALL BE TESTED IN ACCORDANCE WITH <br />APPLICABLE REGULATIONS AND SPECIFICATIONS. <br />14. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL DUST CONTROL <br />REQUIREMENTS AS SET FORTH BY THE FACILITY SUPERVISOR OR HIS <br />DESIGNATED REPRESENTAINE WHEN DRILLING, CORING. OR OTHERWISE <br />MAKING HOLES OR PENETRATIONS INSIDE THE FACILITY BUILDING, <br />INCLUDING SCREW HOLES FOR CONDUIT SUPPORTS. ETC. AS A MINIMUM <br />EFFORT. THE CONTRACTOR SMALL CONTAIN AND COLLECT ALL DUST BY <br />MEANS OF PLASTY SHEET ISOLATION OF THE WORK AREA AND VACUUMING <br />THE DUST AS IT OCCURS. <br />15. NO WORK SHALL BE PERFORMED OVER TELLPHDME SWITCH EQUIPMENT <br />WITHOUT A MOP (METHOD OF PROCEDURE). <br />16. AT&T ENDS SHALL PERFORM 6 MONTH COMPLIANCE TESTING. ANY FAILURES <br />ARE THE RESPONSIBILITY OF THE INSTALLATION CONTRACTOR. <br />17. PROVIDE MONITORING FOR EACH DAY TRIC THAT HAS A CAPACITY OF 100 <br />GALLONS OR MORE. REFER TO THE TANK /LEAK DETECTION <br />SYSTEM ALARM SUMMARY FOR MONITORING REQUIREMENTS. ASSURE ALL <br />SENSORS MEET CALIFORNIA STATE WATER RESOURCES CONTROL BOARD'S <br />0RCB) MOST RECENT REOOREMENTS FOR EACH APPLICATION AS <br />UNED IN SWRCB LETTER L0111 <br />18, PRIOR TO DISCONNECTING THE VEEDER ROOT ILS -350 MONITORING SYSTEM <br />FOR ANY REASON, CONTRACTORS MUST NOTIFY THE CAM (CALIFORNIA <br />ALARMS MANAGER) MO RECEIVE WRITTEN CONFIRMATION 48 HOURS IN <br />ADVANCE OF ACTIVITY. CONTRACTORS MUST CONTACT THE CAM BY CALLING <br />1-800-KNOW-EHS. THE DISCONNECT/MODIFCATON MUST BE DONE BY A <br />VEEDER ROOT CERTIFIED LEVEL 4 TEC <br />FINICIAN. <br />19. CONTRACTOR SHALL CONTACT THE CALIFORNIA PERMIT MANAGER (CPM) AT <br />1 -800 -KNOW -EIS SEVEN DAYS PRIOR TO INSTATING, RELOCATING OR <br />REMOVING AND PORTION OR COMPONENTS ON THE MONITORING SYSTEM IN <br />ANY CALIFORNIA UST FACILITY. <br />29. TAUT &AWWAMEWAL SERMICE (TIES) MILL PIERFORm ALL COMPLIANCE TESTING <br />FOR DSC PST SYSTEM PROJECTS WHRCH NCLIAffiSALLNOTPICATIONS. <br />DOCUMMTAYMN, CERTIFICATIONS AND REPORTINGAS REQUYIEDRY THELOCAL <br />AGENCY. TIE PAV M TO EXCLUDE ANY/ALL COSTS FOR COIVPUANCE TESTING AWN <br />THEIR BIDS. THE GCAPAV WSl COAIV IN WWII THE LOCAL AGENCY WHAT TESTING ✓8 <br />AND INFORM TES. TES WILL PRDVME THE GCA PROPOSAL FOR SITE SPECIRC <br />COA6PLJANCE TESTING, CONTRACT WITH 714E GC AND BILL THE GC FOR SERVICES. <br />THE GC AND PAVMW.L COORDIATEWITH TES FORS OF THE TESTS. <br />21. CONTRACTOR SHALL VERIFY EXACT TANK DIMENSIONS AND SIZE TANK SLAB <br />PER MANUFACTURER'S WARRANTY AND STRUCTURAL DRAWINGS. <br />22. IF ANY OF THE REQUIRE) COMPLIANCE TESTING HAS TO BE RESCHEOULED <br />DDE TO A FARM TEST OR INCOMPLETE WADE¢ THE TANK CONTRACTOR <br />WILL BE SOLELY MABLE FOR ANY AODITMNAL AND TESTING <br />COSTS. ALL POTROLEUM STORAGE TANK SYSTEM WORK RELATED 70 <br />compLmmeE TESTING MUST 8E 400% COMPLETS, FUNCTIONAL AND <br />READY FOR TESTING AND CERTIRCAT/OM (ML - ALL WIRING <br />CONNECTIONS MADS, MNIT PROGRAMMED AND END-704DW <br />COMNEC7WMVENFICA71ONS MADE LINES TORE GAIGC CHECKED, <br />ISOLATED AND CAPPED/ BULKHEAD FITTINOS SECURE, CONTAINMENT <br />80078 IN PLACE -ETC). <br />Ft COVER SHEET AND NOTES <br />F2 PIPING MODPICATION PLAN & NOTES <br />F3 FUEL PIPING DETAILS <br />F4 PROJECT CLOSE-OUT DOCUMENTS B CHECKLISTS <br />ABBREVIATIONS: <br />(E) EXISTING <br />(N) NEW <br />AM AUTHORITY HAVING JURISDICTION <br />M ALLIANCE ARCHITECT <br />AST ABOVEGROUND STORAGE TANK <br />CMM CAUFORNM ALARM MANAGER <br />CAPSEM CALIFORNIA PETROLEUM STORAGE TANK MANAGER <br />CEC CALIFORNIA ENVIRONMENTAL CONSULTANT <br />CPM CALIFORNIA PERMIT MANAGER <br />CTM CALIFORNIA TESTING MANAGER <br />DA DESIGN ARCHITECT <br />WPM DESIGN AND CONSTRUCTION PROJECT MANAGER <br />EAMC EMERGENCY ALARM MANAGEMENT CENTER <br />EH&S ENVIRONMENT, HEALTH AND SAFETY <br />EHSGC ENVIRONMENT, HEALTH. & SAFETY CONTROL CENTER <br />ESM ENVIRONMENTAL SITE MANAGER <br />ELD ENHANCED LEAK DETECTION <br />FOR FUEL OL RETURN <br />FOS FUEL OIL SUPPLY <br />FOV FUEL OL VENT <br />FRP FIBERGLASS REINFORCED PLASTIC <br />GNFO GLOBAL. NETWORK FIELD OPERATOR <br />LA LOCAL AUTHORITY <br />NEC NATIONAL ELECTRIC CODE <br />NFTS NATIONAL FUEL TANK SUPPORT <br />NOC NETWORK OPERATIONS CENTER <br />PAV PETROLEUM APPROVED VENDOR <br />PST PETROLEUM STORAGE TANK <br />PSTC PETROLEUM STORAGE TANK CONTRACTOR <br />RA REVIEW AGENT <br />U.G. UNDERGROUND <br />USA UNDERGROUND SERVICE ALERT <br />USI UNDERGROUND STORAGE TANK <br />S" OBIM <br />ENGINEERS, INC. <br />�5 soin Ute sh®e: <br />Sen /�, CA 95112-2218 <br />996 14th Street. Site 200 - <br />WkN ' G 94612-2'25 <br />99 6 Poem Street <br />y Monterey, CA 93M-1410(408) 282-1500 <br />PAY: (406) 8Y/-2. <br />wwnsetmohrkn.rom <br />REVISIONS AUTHORIZATIONS <br />NT. 621E DATE BY <br />ISSUE MR CUDIT ROVER (8D* 10/1/10 CS <br />RESPONSE TO CLEW REVIEW (BOB) 11/1/10 CS <br />FIRE DEPART" SUBMITTAL 3/15/11 CS <br />C UPA SMMIITAL 4/07/11 CS <br />PROPRIETARY AT&T INFORMATION <br />NOT FOR ODI ML USE DA DOMMME OUTS O AT&T. TIS WOMAKDON INY <br />ONLY E USED BY AUTHMZED PEBSOMMEL O THE LOCAL MOMENT AGM <br />W COWWIDN WITH APRCAT01 FOR PERMITS AM NJ HM706 MR BUILDINGS <br />AtB/ OR ZONES OWIGM <br />DWINOS P. . a, FOR <br />4' CORPORATE <br />REALESTATE <br />ABOVEGROUND <br />FUEL PIPING MODIFICATIONS <br />FOR STANDBY GENERATOR SYSTEM <br />345 N. SAN JOAQUIN STREET <br />STOCKTON,CA <br />SKTNCA01 UE042 <br />SHEET TOLE: <br />COVER SIFT <br />AND NOTES <br />PROJECT i - I CONSULTANT PROM $ 2007680049 <br />DATE 09/30/10 SCALE: AS NGIED <br />- DRAWN BY: D6 DECKED BY: CBS <br />AT&T 7mT: 1 OF: 4 SHEETS SHEET NO. <br />BM Td 707.765.1660 AT&T NO- <br />�j1 <br />Oft „37 U.S-IFGc 707.765.9008 - 1 <br />P9tdiR- CA A94954', -'-L <br />94954 mvstwft 9m ROD SATRE 1 <br />wA <br />• P, <br />1 <br />aa <br />ar <br />o« <br />) a <br />COORDINAIM <br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL <br />WORK. <br />2. THE GENERAL CONTRACTOR SHALL RESOLVE DIFFERENCES OR DISPUTES <br />CONCERNING COORDMWTIO N, INTERFERENCE, OR EXTENT OF WORK. <br />3. USE LARGE-SCALE LAYOUT DRAWINGS OF OTHER AFFECTED WORK, TO <br />CHECK, COORDINATE AND INTEGRATE THE WORK TO PREVENT <br />INTERFERENCES <br />4. COORDINATE WORK PERFORMED BY AT&T AND OTHERS AS R INVOLVES THE <br />EXECUTION OF THIS WORK. <br />5, COORDINATE DELIVERY AND STORAGE OF AT&T FURNISHED EQUIPMENT AND <br />FUEL FOR TESTING. <br />CUTTING AND PATCHING: <br />1. PATCHING SHALL SUCCESSFULLY DUPLICATE UNDISTURBED ADJACENT FINISHES, <br />COLORS, TEXTURES AND PROFILES. <br />2. COMPLY WITH ALL LOCAL ORDINANCES AND CAL -OSHA REGULATIONS FOR <br />INDUSTRIAL SAFETY. DO NOT CUT OR ALTER STRUCTURAL MEMBERS WITHOUT <br />PRIOR WRITTEN APPROVAL OF AT&T. <br />3. PERFORM CUTTING, ASSOCIATED STRUCTURAL REINFORCING AND PATCHING IN <br />A MANNER TO PREVENT DAMAGE TO OTHER WORK AND TO PROVIDE PROPER <br />SURFACES FOR THE INSTALLATION OF MATERIALS, EQUIPMENT AND REPAIRS, <br />PERFORM DEMOLITION WORK IN SUCH MANNER AS TO PREVENT DAMAGE TO <br />EXISTING FACILITIES TO REMAIN OR TO BE SALVAGED, AND TO PREVENT <br />INJURY TO PUBLIC AND WORKERS ENGAGED ON SITE UNDER THIS OR OTHER <br />CONTRACTS. DEMOLITION DEBRIS SHALL NOT BE MOWED TO ACCUMULATE ON <br />SITE. HAZARDOUS WORK SHALL NOT BE LEFT STANDING OR FLANGING <br />OVERNIGHT OR WEEKENDS. <br />4. WHEREVER CUTTING AND REMOVAL OF PORTIONS OF EXISTING WORK 15 <br />INDICATED, SUCH WORK SMALL BE CUT IN A MANNER THAT WALL PRODUCE <br />NEAT AND STRAIGHT LINES, PARALLEL TO ADJACENT SURFACES OR PLUMB <br />FOR VERTICAL SURFACES. GRIND SMOOTH RESULTING EDGES OF CONCRETE <br />SLABS OR WALKS. <br />5. NEATLY REMOVE EXISTING FINISH MATERIALS BACK 70 CLEAN STRAIGHT LINE <br />ON NEAREST SUPPORT IN ORDER TO FACILITATE INSTALLATION O NEW <br />MATERIALS, PATCHES OR REPAIRS. EXECUTE CUTTING AND DEMOLITION BY <br />METHODS WHICH WILL PREVENT DAMAGE TO OTHER WORK AND WHICH WILL <br />PROVIDE PROPER SURFACES TO RECEIVE INSTALLATION OF REPAIRS AND NEW <br />WORK. <br />6. KEEP AREAWAYS, WALKS, CORRIDORS AND STREETS FREE OF ORT AND <br />RUBBISH. <br />7. REPAIR OR REPLACE IMPROVEMENTS DAMAGED AS A RESULT OF THIS WORK <br />AT NO ADDITIONAL EXPENSE TO AT&T. <br />S. PROVIDE WATER DAMS AND OTHER CONTAINMENT PROCEDURES, AS <br />NECESSARY, FOR CONTROLLING WATER USED FOR CONCRETE SAW CUTTING. <br />PIPING INSTALLATION NOTES <br />1. ALL FUEL OL SUPPLY, RETURN AND VENT PIPING SHALL BE INSTALLED <br />ABOVEGROUND (AS PRACTICAL). <br />2. ABOVEGROUND FUEL OL SUPPLY, RETURN AND VENT PIPING SHALL BE ASTM <br />A53 SCHEDULE 40 DOMESTIC (NORTH AMERICA) BLACK STEEL PIPE WITH <br />THREADED OR WELDED ,DINTS <br />3. ABOVEGROUND INTERIOR FUEL OL SUPPLY AND RETURN PIPING INSTALLED <br />IN AREAS WITHOUT CONTAINMENT SHALL BE INSTALLED WITH MONITORED <br />SECONDARY CONTAINMENT. <br />4. PROVIDE ADEQUATE PIPE SUPPORTS WHERE REWIRED. <br />5. INSTALL ALL PIPING THAT IS NOT SECONDARILY CONTAINED IN A MANNER <br />THAT WILL ALLOW VISUAL INSPECTION OF THE ENTIRE PIPING SYSTEM <br />INCLUDING TOP, SIDES AND BOTTOM. CHECK WITH AUTHORITY HAVING <br />JURISDICTION FOR CLEARANCE REQUIREMENTS <br />6. ALL EXPOSED PIPING SHALL BE MARKED AT INTERVALS NO GREATER THAN <br />EVERY TWENTY (20) FEET YOUTH PRODUCT COLOR -CODED DIRECTIONAL FLOW <br />ARROWS, LINES SHALL RE MARKED AT EACH CHANGE IN DIRECTION AND <br />WHERE WALL, CEILING, OR FLOOR PENETRATIONS OCCUR. IF LINES ARE <br />SHORTER THAN TWENTY (20) FEET, MARKINGS SHALL APPEAR AT LEAST <br />ONCE ALONG THEIR LENGTH. <br />7. GALVANIZED PPE OR FITTINGS SHALL NOT BE USED FOR DIESEL SERVICE. <br />8. SCOTCH KOTE ABOVEGROUND STEEL PIPING. <br />NOTE PERSUANT TO STOCCTON FIRE DEPARTMENT REQUEST; ALL PIPE WELDING <br />IS TO BE INSPECTED AND APPROVED BY A THIRD PARTY WELDING EVALUATOR. <br />ACCEPTABLE THIRD PARTY WELDING EVALUATORS ARE OSTEO AT THE FOLLOWING <br />WEBSITE: Mt4://rww.innnnl'rIe-oro/FobrkAta Ineoeetimi Prmram A.html <br />1. APPROVED PAY SNAIL BE RESPONSIBLE FOR ALL NOTIFICATIONS AND <br />SCHEDULING IN CONNECTION WITH PETROLEUM STORAGE TANK <br />REQUIREMENTS AND SHALL MAINTAIN A SITE SPECIFIC SITE SAFETY PLAN <br />DURING ALL WORK ACTIVITIES. <br />2. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EOUIPMENT AND <br />SERVICES NECESSARY FOR THE SATISFACTORY COMPLETION OF ALL WORK <br />CALLED FOR OR REQUIRED BY THE CONTRACT DOCUMENTS. <br />3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE OF FOLLOWING: <br />A LOCAL, STATE AND FEDERAL ABOVEGROUND STORAGE TANK REGULATIONS. <br />8. ADOPTED FIRE CODE. <br />C. CAL -OSHA REGULATIONS. <br />D. ADOPTED NATIONAL ELECTRIC CODE. <br />E. ALL CRY, COUNTY, AND STATE LAWS AND ORDINANCES. <br />F. PEI RP200 AS THE INDUSTRY STANDARD FOR INSTALLATION OF <br />ABOVEGROUND PETROLEUM STORAGE TANKS. <br />4. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO REMAIN UNLESS <br />NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR REPLACE ANY EXISTING <br />FACILITIES WHICH ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS TO THE <br />SATISFACTION OF AT&T. <br />5. IT SHALL BE THE GENERAL CONT'RACTOR'S RESPONSIBILITY TO DETERMINE <br />THE EXACT LOCATION(S) AND/OR EXISTENCE OF ALL UNDER -GROUND <br />UTILITIES IN WORK AREA PR TO CONSTRUCTION WITH A PRIVATE UTILITY <br />LOCATOR. <br />6. STANTEC ARCHITECTURE INC.. UNLESS OTHERWISE DETERMINED, SHALL APPLY <br />AND PAY FOR ALL PERMITS REQUIRED FINK THE COMPLETION OF THIS <br />PROJECT. CONTRACTOR TO SUPPLY CERTIFICATE O INSURANCE, CITY <br />BUSINESS LICENSE, EVIDENCE OF CONTRACTORS UCENSE AND ANY OTHER <br />ID'ORMATION WHICH THE PERMITTING AGENCY REWIRES FROM <br />CONTRACTORS. <br />7. GENERAL CONTRACTOR SHALL L NOTIFY THE ENGINEER PROMPTLY IF SITE <br />CONDITIONS OR DIMENSIONS DISAGREE WITH INFORMATION SHOO ON THESE <br />DRAWINGS. WORK IS NOT TO PROCEED LWM SUCH DIFFERENCES ARE <br />RESOLVED. <br />8, GENERAL CONTRACTOR SHALL PROVIDE A DETAKZD METHOD OF PROCEDURE <br />M.O.P.) TO AT&T FOR APPROVAL PRIOR TO START OF CONSTRUCTION. MOP <br />INCLUDE BUILDING VENTILATION SAFETY PROCEDURES. <br />9. GENERAL CONTRACTOR SHALL SUPPLY AT&T WITH A DETAILED WORK <br />SCHEDULE MID UPDATE PROGRESS AND/OR CHANGES ON A WEEKLY BASIS. <br />10. APPROVED PAV SHALL PROVIDE THREE SETS O SUBMITTALS ON ALL <br />EQUIPMENT TO THE ENGINEER PRIOR TO START OF CONSTRUCTION. <br />11. ALL ELECTRICAL WORK TO BE DONE IN COMPLIANCE WITH CHAPTER 5, <br />ARTICLES 500-50 AND 514 OF TNR' NATIONALELECTRIC COIF. SEAT ALL <br />CONDUITS AS REWIRED UNDER THE CODE. <br />12. APPROVED PAV SHALL SUPPLY FIVE COMPLETE SETS OF OPERATION, <br />MAINTENANCE AND TEST DATA TO GENERAL CONTRACTOR. OPERATIONAL, <br />MAINTENANCE AND TEST DATA SHALL INCLUDE ALL THE ITEMS LISTED ON <br />SHEET F7 - PROJECT CLOSE-OUT DOCUMENTS AND CHECKLISTS. ALL <br />DOCUMENTS TO BE IN ACCORDANCE WITH CURRENT AT&T EMS 200 SERIES <br />PRACMES MW CHECKLISTS FOR REGULATORY BINDERS AND ON-SITE <br />BINDERS. <br />13. NEW TANKS AND PIPING SHALL BE TESTED IN ACCORDANCE WITH <br />APPLICABLE REGULATIONS AND SPECIFICATIONS. <br />14. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL DUST CONTROL <br />REQUIREMENTS AS SET FORTH BY THE FACILITY SUPERVISOR OR HIS <br />DESIGNATED REPRESENTAINE WHEN DRILLING, CORING. OR OTHERWISE <br />MAKING HOLES OR PENETRATIONS INSIDE THE FACILITY BUILDING, <br />INCLUDING SCREW HOLES FOR CONDUIT SUPPORTS. ETC. AS A MINIMUM <br />EFFORT. THE CONTRACTOR SMALL CONTAIN AND COLLECT ALL DUST BY <br />MEANS OF PLASTY SHEET ISOLATION OF THE WORK AREA AND VACUUMING <br />THE DUST AS IT OCCURS. <br />15. NO WORK SHALL BE PERFORMED OVER TELLPHDME SWITCH EQUIPMENT <br />WITHOUT A MOP (METHOD OF PROCEDURE). <br />16. AT&T ENDS SHALL PERFORM 6 MONTH COMPLIANCE TESTING. ANY FAILURES <br />ARE THE RESPONSIBILITY OF THE INSTALLATION CONTRACTOR. <br />17. PROVIDE MONITORING FOR EACH DAY TRIC THAT HAS A CAPACITY OF 100 <br />GALLONS OR MORE. REFER TO THE TANK /LEAK DETECTION <br />SYSTEM ALARM SUMMARY FOR MONITORING REQUIREMENTS. ASSURE ALL <br />SENSORS MEET CALIFORNIA STATE WATER RESOURCES CONTROL BOARD'S <br />0RCB) MOST RECENT REOOREMENTS FOR EACH APPLICATION AS <br />UNED IN SWRCB LETTER L0111 <br />18, PRIOR TO DISCONNECTING THE VEEDER ROOT ILS -350 MONITORING SYSTEM <br />FOR ANY REASON, CONTRACTORS MUST NOTIFY THE CAM (CALIFORNIA <br />ALARMS MANAGER) MO RECEIVE WRITTEN CONFIRMATION 48 HOURS IN <br />ADVANCE OF ACTIVITY. CONTRACTORS MUST CONTACT THE CAM BY CALLING <br />1-800-KNOW-EHS. THE DISCONNECT/MODIFCATON MUST BE DONE BY A <br />VEEDER ROOT CERTIFIED LEVEL 4 TEC <br />FINICIAN. <br />19. CONTRACTOR SHALL CONTACT THE CALIFORNIA PERMIT MANAGER (CPM) AT <br />1 -800 -KNOW -EIS SEVEN DAYS PRIOR TO INSTATING, RELOCATING OR <br />REMOVING AND PORTION OR COMPONENTS ON THE MONITORING SYSTEM IN <br />ANY CALIFORNIA UST FACILITY. <br />29. TAUT &AWWAMEWAL SERMICE (TIES) MILL PIERFORm ALL COMPLIANCE TESTING <br />FOR DSC PST SYSTEM PROJECTS WHRCH NCLIAffiSALLNOTPICATIONS. <br />DOCUMMTAYMN, CERTIFICATIONS AND REPORTINGAS REQUYIEDRY THELOCAL <br />AGENCY. TIE PAV M TO EXCLUDE ANY/ALL COSTS FOR COIVPUANCE TESTING AWN <br />THEIR BIDS. THE GCAPAV WSl COAIV IN WWII THE LOCAL AGENCY WHAT TESTING ✓8 <br />AND INFORM TES. TES WILL PRDVME THE GCA PROPOSAL FOR SITE SPECIRC <br />COA6PLJANCE TESTING, CONTRACT WITH 714E GC AND BILL THE GC FOR SERVICES. <br />THE GC AND PAVMW.L COORDIATEWITH TES FORS OF THE TESTS. <br />21. CONTRACTOR SHALL VERIFY EXACT TANK DIMENSIONS AND SIZE TANK SLAB <br />PER MANUFACTURER'S WARRANTY AND STRUCTURAL DRAWINGS. <br />22. IF ANY OF THE REQUIRE) COMPLIANCE TESTING HAS TO BE RESCHEOULED <br />DDE TO A FARM TEST OR INCOMPLETE WADE¢ THE TANK CONTRACTOR <br />WILL BE SOLELY MABLE FOR ANY AODITMNAL AND TESTING <br />COSTS. ALL POTROLEUM STORAGE TANK SYSTEM WORK RELATED 70 <br />compLmmeE TESTING MUST 8E 400% COMPLETS, FUNCTIONAL AND <br />READY FOR TESTING AND CERTIRCAT/OM (ML - ALL WIRING <br />CONNECTIONS MADS, MNIT PROGRAMMED AND END-704DW <br />COMNEC7WMVENFICA71ONS MADE LINES TORE GAIGC CHECKED, <br />ISOLATED AND CAPPED/ BULKHEAD FITTINOS SECURE, CONTAINMENT <br />80078 IN PLACE -ETC). <br />Ft COVER SHEET AND NOTES <br />F2 PIPING MODPICATION PLAN & NOTES <br />F3 FUEL PIPING DETAILS <br />F4 PROJECT CLOSE-OUT DOCUMENTS B CHECKLISTS <br />ABBREVIATIONS: <br />(E) EXISTING <br />(N) NEW <br />AM AUTHORITY HAVING JURISDICTION <br />M ALLIANCE ARCHITECT <br />AST ABOVEGROUND STORAGE TANK <br />CMM CAUFORNM ALARM MANAGER <br />CAPSEM CALIFORNIA PETROLEUM STORAGE TANK MANAGER <br />CEC CALIFORNIA ENVIRONMENTAL CONSULTANT <br />CPM CALIFORNIA PERMIT MANAGER <br />CTM CALIFORNIA TESTING MANAGER <br />DA DESIGN ARCHITECT <br />WPM DESIGN AND CONSTRUCTION PROJECT MANAGER <br />EAMC EMERGENCY ALARM MANAGEMENT CENTER <br />EH&S ENVIRONMENT, HEALTH AND SAFETY <br />EHSGC ENVIRONMENT, HEALTH. & SAFETY CONTROL CENTER <br />ESM ENVIRONMENTAL SITE MANAGER <br />ELD ENHANCED LEAK DETECTION <br />FOR FUEL OL RETURN <br />FOS FUEL OIL SUPPLY <br />FOV FUEL OL VENT <br />FRP FIBERGLASS REINFORCED PLASTIC <br />GNFO GLOBAL. NETWORK FIELD OPERATOR <br />LA LOCAL AUTHORITY <br />NEC NATIONAL ELECTRIC CODE <br />NFTS NATIONAL FUEL TANK SUPPORT <br />NOC NETWORK OPERATIONS CENTER <br />PAV PETROLEUM APPROVED VENDOR <br />PST PETROLEUM STORAGE TANK <br />PSTC PETROLEUM STORAGE TANK CONTRACTOR <br />RA REVIEW AGENT <br />U.G. UNDERGROUND <br />USA UNDERGROUND SERVICE ALERT <br />USI UNDERGROUND STORAGE TANK <br />S" OBIM <br />ENGINEERS, INC. <br />�5 soin Ute sh®e: <br />Sen /�, CA 95112-2218 <br />996 14th Street. Site 200 - <br />WkN ' G 94612-2'25 <br />99 6 Poem Street <br />y Monterey, CA 93M-1410(408) 282-1500 <br />PAY: (406) 8Y/-2. <br />wwnsetmohrkn.rom <br />REVISIONS AUTHORIZATIONS <br />NT. 621E DATE BY <br />ISSUE MR CUDIT ROVER (8D* 10/1/10 CS <br />RESPONSE TO CLEW REVIEW (BOB) 11/1/10 CS <br />FIRE DEPART" SUBMITTAL 3/15/11 CS <br />C UPA SMMIITAL 4/07/11 CS <br />PROPRIETARY AT&T INFORMATION <br />NOT FOR ODI ML USE DA DOMMME OUTS O AT&T. TIS WOMAKDON INY <br />ONLY E USED BY AUTHMZED PEBSOMMEL O THE LOCAL MOMENT AGM <br />W COWWIDN WITH APRCAT01 FOR PERMITS AM NJ HM706 MR BUILDINGS <br />AtB/ OR ZONES OWIGM <br />DWINOS P. . a, FOR <br />4' CORPORATE <br />REALESTATE <br />ABOVEGROUND <br />FUEL PIPING MODIFICATIONS <br />FOR STANDBY GENERATOR SYSTEM <br />345 N. SAN JOAQUIN STREET <br />STOCKTON,CA <br />SKTNCA01 UE042 <br />SHEET TOLE: <br />COVER SIFT <br />AND NOTES <br />PROJECT i - I CONSULTANT PROM $ 2007680049 <br />DATE 09/30/10 SCALE: AS NGIED <br />- DRAWN BY: D6 DECKED BY: CBS <br />AT&T 7mT: 1 OF: 4 SHEETS SHEET NO. <br />BM Td 707.765.1660 AT&T NO- <br />�j1 <br />Oft „37 U.S-IFGc 707.765.9008 - 1 <br />P9tdiR- CA A94954', -'-L <br />94954 mvstwft 9m ROD SATRE 1 <br />