My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it Itw =V• t=�-V A•" <br />YES <br />NO N/A <br />N/A <br />E] <br />❑ <br />0 <br />1. APPROVED CUPA PERMIT W/ SIGN OFF. <br />0 <br />0 <br />❑ <br />2. APPROVED FIRE DEPARTMENT PERMIT W/ SIGN OFF. <br />❑ <br />0 <br />❑ <br />3. APPROVED BUILDING PERMIT WITH SIGN OFF. <br />❑ <br />0 <br />❑ <br />4. ADDITIONAL PERMITS REQUIRED W/ SIGN OFF. <br />Cj <br />0 <br />0 <br />5. AQMD (ATC). <br />E] <br />F] <br />F1 <br />6. U.S.A. EXCAVATION PERMIT NO. <br />E] <br />E <br />❑ <br />7. AT&T MOP. <br />0 <br />n <br />❑ <br />8. SITE SPECIFIC HEALTH & SAFETY PLAN. <br />0 <br />❑ <br />9. PROJECT SCHEDULE. <br />F <br />n <br />10. 48 HOUR INSPECTION NOTIFICATIONS. <br />E] <br />E] <br />[3 <br />11. LETTER OF COMPLETION (REPAIRS ONLY). <br />I] <br />❑ <br />12. FORM "C". <br />® <br />n <br />13. PERMIT EXTENSIONS. <br />14. ALL AGENCY CORRESPONDENCE/ W CONFIRMATIONS. <br />1, TANK MANUFACTURER'S CUT SHEETS/TANK CHART. <br />2. TANK MANUFACTURER'S WARRANTY. <br />3. COMPLETED MANUFACTURER'S INSTALLATION CHECKLIST. <br />4. PIPING SUMPS MANUFACTURER'S CUT SHEETS/WARRANTY. <br />5. DAY TANK MANUFACTURER'S CUT SHEETS/ TANK CHART. <br />S. DAY TANK MANUFACTURER'S WARRANTY. <br />7. PUMPS MANUFACTURER'S CUT SHEETS <br />B. MONITORING SYSTEM MANUFACTURER'S CUT SHEETS. <br />9. MONITORING SYSTEM MANUFACTURER'S WARRANTIES. <br />10. HYDROSTATIC MONITORINFG FLUID - CUT SHEETS. <br />11. OVERFILL ALARM MANUFACTURER'S CUT SHEETS. <br />12. PIPE MANUFACTURER'S CUT SHEETS. <br />13. PIPE MANUFACTURER'S WARRANTIES. <br />14. OVERFILL/SPILL PROTECTION. <br />15. TRANSITION SUMPS. <br />16. TIGHT -FILL FITTINGS AND ADAPTERS <br />17. CHECK VALVES. <br />18. EXTRACTOR HOUSINGS. <br />19. STAINLESS STEEL FLEX CONNECTORS. <br />20. CONTAINMENT FITTINGS. <br />21. MANWAY LIDS. <br />22. DEAD MEN. <br />23. OBSERVATION WELLS <br />24. CORROSION RESISTANT COATINGS <br />25. OTHER <br />YES <br />NO N/A <br />N/A <br />1. POTS LINE ORDER & SERVICE FORM. <br />❑ <br />❑ <br />1. 3 VANTAGE POINTS OF CONSTRUCTION SITE PRIOR TO CONSTRUCTION. <br />n <br />Ej <br />n <br />2. DAILY EXCAVATION. <br />5. 48 HOUR INSPECTION NOTIFICATION REQUEST. <br />(CURRENT - 24 MONTHS). <br />n <br />3. COMPLETED EXCAVATION. <br />® <br />[:] <br />❑ <br />4. CONCRETE REINFORCEMENT STEEL IN PLACE FOR HOLD-DOWN PAD. <br />Cj <br />n <br />n <br />5. POURING CONCRETE HOLD-DOWN PAD. <br />E] <br />n <br />[:] <br />S. PLACEMENT OF PEA GRAVEL BEDDING ON SLAB. <br />MFG'S RECOMMENDATION OR 36 MONTHS WHICHEVER IS SHORTER). <br />E <br />❑ <br />7. PRESSURE TESTING TANK PRIOR TO INSTALLATION. <br />® <br />❑ <br />8. SETTING TANK ON PEA GRAVEL BEDDING. <br />0 <br />❑ <br />9. OBSERVATION WELL INSTALLATION. <br />E] <br />n <br />10. ANCHORING TANK AND COATING ANCHOR COMPONENTS WITH <br />CORROSION RESISTANT MATERIAL. <br />I] <br />❑ <br />11. PLACEMENT OF PEA GRAVEL BACKFILL TO TOP OF TANK. <br />® <br />n <br />12. INSTALLATION OF ALL PIPE RISERS AND CORROSION RESISTANT <br />COATING IF APPLICABLE. <br />n <br />n <br />13. INSTALLATION OF PIPING SUMPS. <br />14. PIPE TRENCHES AND PEA GRAVEL BEDDING. <br />E <br />n <br />15. PIPE INSTALLED ON PEA GRAVEL BEDDING. <br />E <br />❑ <br />16. EACH TRANSITION SUMP INSTALLED. <br />n <br />17. PIPING SUMP AND SPILL CONTAINMENT LAKE TESTS. <br />® <br />[:] <br />18. BUILDING WALL PENETRATIONS FOR PIPE. <br />Ej <br />19. BACKFILL PLACEMENT TO SUBGRADE. <br />❑ <br />20. FINE GRADED AFFECTED AREA OF CONSTRUCTION. <br />E] <br />n <br />21. CONCRETE REINFORCEMENT STEEL IN PLACE FOR SURFACE SLAB. <br />❑ <br />E] <br />E] <br />22. CONCRETE POUR OF SURFACE SLAB. <br />® <br />n <br />n <br />23. FINISHED PROJECT. <br />E] <br />[3 <br />f -I <br />24. SERIES OF BASEMENT ENGINE ROOM PHOTOS TO ENCOMPASS ALL <br />PIPING AND VEEDER ROOT LEAK DETECTION SYSTEM. <br />Brum, Gra <br />.• �I <br />CONTRACTOR OU�s Ae TIOW <br />YNO <br />ES <br />N/A <br />1. POTS LINE ORDER & SERVICE FORM. <br />❑ <br />❑ <br />1. CALIFORNIA STATE CONTRACTORS LICENSE. <br />❑ <br />Ej <br />2. CURRENT ICC UST INSTALLATION/RETROFITTING CERTIFICATION <br />® <br />5. 48 HOUR INSPECTION NOTIFICATION REQUEST. <br />(CURRENT - 24 MONTHS). <br />6. SYSTEM DISCONNECT (EH&S NOTIFICATION). <br />3. CURRENT ICC TANK REMOVAL CERTIFICATION (CURRENT - 24 MONTHS). <br />❑ ❑ ❑ <br />E] <br />4. CURRENT TANK MANUFACTURER'S INSTALLER CERTIFICATION (USE <br />9. OTHER <br />MFG'S RECOMMENDATION OR 36 MONTHS WHICHEVER IS SHORTER). <br />Ej E] <br />E] <br />5. CURRENT PIPE MANUFACTURER'S INSTALLATION CERTIFICATION (USE <br />MFG'S RECOMMENDATION OR 36 MONTHS WHICHEVER IS SHORTER). <br />E <br />E] <br />6. VEDDER ROOT MONITORING SYSTEM TECHNICIAN'S CERTIFICATION <br />(MUST BE MFG'S HIGHEST RANKING LEVEL OR CERTIFICATION). <br />7. CONTRACTOR'S WORKMANSHIP WARRANTY. <br />YES NO N/A <br />❑ <br />1. POTS LINE ORDER & SERVICE FORM. <br />Ej ❑ E] <br />2. ALARMS TESTED AND CONFIGURED TO PROPER SETTINGS. <br />0 ® <br />3. WARRANTY START-UP FORM. <br />Ej <br />4. QA/OC VEEDER ROOT CONSOLE. <br />® <br />5. 48 HOUR INSPECTION NOTIFICATION REQUEST. <br />Cj E] Ej <br />6. SYSTEM DISCONNECT (EH&S NOTIFICATION). <br />7. WARRANTY, OWNER'S, AND OPERATOR'S MANUALS. <br />❑ ❑ ❑ <br />8. MONITORING FLUID CERTIFICATION. <br />E] [:] E] <br />9. OTHER <br />OUT ATM <br />ON COMPLETION OF THE PROJECT PROVIDE 3 COPIES IN 3 -RING BINDERS AND 1 CD OF ALL <br />INFORMATION LISTED TO THE CA PST PROJECT MANAGER FOR DISTRIBUTION <br />3 OPERATION AND MAINTENANCE BINDERS (SEPARATE FROM ABOVE) <br />•°° PRINT AND SIGN YOUR NAME TO INDICATE FINAL ACCEPTANCE OF WORK <br />AFTER FINAL INSPECTION +°i <br />1. ALLIANCE ARCHITECT (AA) (FROM GC UPON PROJECT COMPLETION). <br />AFTER AA COMPLETES REVIEW THEN DISTRIBUTE TO THE FOLLOWING; <br />2. EH&S - TEXAS <br />3. CA PST PM <br />4. D&C DATA ADMINISTRATOR (DA) <br />YES NO N/A AT&T PROPRIETARY (INTERNAL USE ONLY) <br />M M 1. TANK DELIVERY CHECKLIST. NOT FOR USE OR DISCLOSURE OUTSIDE THE AT&T COMPANIES <br />0 ❑ 2. TANK PRESSURE CHECK AFTER BACKFILL. EXCEPT UNDER WRITTEN AGREEMENT <br />3. PRIMARY PIPING TEST PRIOR TO BACKFILLING. <br />F] E ❑ 4. SECONDARY CONTAINMENT PIPING CHECK PRIOR TO BACKFILLING. <br />5. SECONDARY CONTAINMENT PIPING CHECK AFTER BACKFILUNG. <br />® [_] 6. PIPING/TRANSITION SUMP CHECKS. <br />E f -I 7. 48 HOUR NOTIFICATIONS, <br />YES NO N/A <br />E 0 <br />1. TEMPORARY CLOSURE CUPA INSPECTION. <br />E 0 <br />2. TEMPORARY CLOSURE DUSTO INSPECTIONS (EVERY 2 MONTHS) <br />0 ® <br />3. VEEDER ROOT DISCONNECT NOTIFICATION. <br />Ej <br />4. APPROVAL LETTER TO BACKFILL <br />® <br />5. CLOSURE REPORT. <br />® ❑ <br />6. ALL TRANSMITTALS INCLUDING SEND /RECEIVED NOTIFICATIONS <br />1:n I I XMI LIDXOE-_--u-._ :111 <br />YES NO N/A <br />E] ❑ [:] <br />1. MONITORING SYSTEM CERTIFICATION. <br />❑ ❑ <br />2. SPILL BUCKET CERTIFICATION. <br />3. SS -989 CERTIFICATION. <br />4. PRECISION TIGHTNESS TESTS LINES. <br />E] n Fj <br />5. ELD TESTS. <br />6. CATHODIC PROTECTION. <br />7. TANK INTEGRITY TESTING. <br />E] <br />8. 48 HOUR NOTIFICATIONS <br />T DRAWNW TO SCALE <br />«+ RED LINE ANY AND ALL CHANGES FROM THE ORIGINAL PLANS AND SPECIFICATIONS btY <br />YES NO N/A <br />rl 1. TANK AND UNDERGROUND PIPING NETWORK CLEARLY DEPICTED. <br />E] E] 2. ALL APPURTENANCES IDENTIFIED ON TANK. <br />F] n 3. PIPING SCHEMATIC FOR BASEMENT. <br />E f-1 4. ALL COMPONENTS OF THE FUEL SYSTEM ARE SHOWN IN RELATION TO <br />A SIGNIFICANT STRUCTURE ON SITE. <br />E f -I 5. ALL UNDERGROUND UTILITIES ENCOUNTER CLEARLY MARKED. <br />►:" oum <br />ENGINEERS, INC. <br />30 south lith sb, <br />Seo ]-. G AN "", <br />438 14th Street, softs 200 <br />Oeklmd. CA 5/812-2425 <br />- 495 Foam 34 <br />Mootaree. CA 93840-1410 <br />(408) 282-1No <br />six (4aJ 204-2393 <br />aeo.eolaeahafon.eom <br />REVISIONS AUTHORIZATIONS <br />NO. ISSUE DATE BY <br />ISSUE FOR am um (BOAS 10/1/10 CW <br />RESPONSE TO CUDIT RMV (BONN) 11/1/10 CSI <br />FM DEPART" SUBATIAL 3/15/11 CSI <br />COPA SUBMITTAL 4/07/11 CSI <br />PROPRIETARY AT&T INFORMATION <br />NOT FOR ffMRAL USE OR DiSCUXURE OUISM OF AT&T. TIAs WOMWO WY <br />ONLY BE USED 9Y 911FI0Rl&D PUMAID. OF THE LOCAL OMMM AGCY <br />H COO&IM MIM APPLICATION FOR PD WIS AND AUMMZAIM FOR &ALDNO% <br />CONSIRLICIM AND/ OR ZMIC OIAIM <br />DIIAWM PWAM MR <br />atext CORPORATE <br />VREAL ESTATE <br />ABOVEGROUND <br />FUEL PIPING MODIFICATIONS <br />FOR STANDBY GENERATOR SYSTEM <br />345 N. SAN JOAQUIN STREET <br />STOCKTON,CA <br />SKTNCAOT <br />PROJECT CLOSMUT SHEET <br />YIC. Td 707.765.16601 <br />SS 1137 tL MlOwM WAIFm.7O7.765.9908 <br />Id-_ -, G _.SA 94954 - ROD SATRE <br />UE042 <br />COFSIATAIT PROJECT / 9 <br />DATE 09/30/10 SCALE: AS SINN <br />DRWN 9Y: DS I CHECKED BY: CSB <br />SHEET: 4 Of: 4 SHELLS SIM NO. <br />AT&T DRWW W.: F4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.