Laserfiche WebLink
L NOTIFICATIONS AND F1 COVER SKEET AND NOTES <br />;TORAGE TANK <br />:CIFIC SITE SAFETY PLAN F2 PIPING MODIFICATION PLAN & NOTES <br />?IALS, EQUIPMENT AND F3 FUEL PIPING DETAILS <br />OMPLETION OF ALL WORK <br />)OCUMENTS. F4 PROJECT CLOSE-OUT DOCUMENTS & CHECKLISTS <br />CE WITH THE OF FOLLOWING: <br />STORAGE TANK REGULATIONS. <br />LITIES TO REMAIN UNLESS <br />OR REPLACE ANY EXISTING <br />kCTOR'S OPERATIONS TO THE <br />i A <br />ABBREVIATIONS: <br />'ONSIBILITY TO DETERMINE <br />ALL UNDER -GROUND <br />WITH A PRIVATE UTILITY <br />AHJ <br />AUTHORITY)N <br />i i <br />DETERMINED, <br />i, iAPPLY <br />COMPLETION <br />ABOVEGROUND STORAGE <br />OF <br />i• <br />LICENSE AND ANY OTHER <br />i. PETROLEUM i`NK MA <br />7.QUIRES FROMCALIFORNIA-wCONSULTANT <br />CPM <br />CALIFORNIA <br />. PROMPTLYi• <br />DRMATION SHOWNON <br />*. <br />DESIGN <br />;UCH DIFFERENCES ARE <br />DCPM <br />DESIGN i CONSTRUCTION PROJECT <br />EAMC <br />EMERGENCY ALARM MANAGEMENT CENTER <br />ED METHOD OF PROCEDURE <br />i i SAFETY <br />RT OF CONSTRUCTION. MOP <br />EHSCC <br />ENVIRONMENT, HEALTH, & SAFElY CONTROL CENTER <br />ROCEDURES. <br />ENVIRONMENTAL <br />DETAILED WORK <br />ELD <br />ENHANCED LEAK DETECTION <br />kNGES ON A WEEKLY BASIS. <br />FOR <br />FUEL OIL <br />ON <br />OIL SUPPLY <br />OF i i - <br />FOV <br />FUEL OIL VENT <br />iNCE WITH CHAPTER 5, <br />FRP <br />FIBERGLASS REINFORCED PLASTIC <br />CODE.GNFO <br />GLOBAL NETWORK FIELD OPERATOR <br />LA <br />LOCAL AUTHORITY <br />OF OPERATION,NEC <br />NATIONALii <br />., «. OPERATIONAL,NFTS <br />NATIONALSUPPORT <br />_L THE ITEMS LISTED ON <br />NOC <br />NETWORK OPERATIONS CENTER <br />AND CHECKLISTS. ALL <br />PAV <br />PETROLEUM ...i' r VENDOR <br />i• SERIES <br />PST <br />PETROI FUM i -AGE TANK <br />i ` . l ON-SITE <br />PETROI FUM STORAGE• i` <br />RA <br />REVIEW AGENT <br />�=RDANCE WITH <br />UNDERGROUND <br />USA <br />UNDERGROUND <br />ALL DUST i •i: <br />UST <br />UNDERGROUND STORAGE <br />