Laserfiche WebLink
n <br />SWRCB, January 2002 Page 3 of 5 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 4" Liquid Gauge Equipment Resolution:. l <br />Piping Run # Piping Run # Piping Run # Piping Run # <br />UE042U001 Sup #1 �UE042UO01 Sup #2 UE042U001 Vnt/Rtn <br />Piping Material: <br />Poly <br />Poly <br />Fiberglass <br />Piping Manufacturer: <br />Total containment <br />Total Containment <br />A.O. Smith <br />Piping Diameter: <br />2" <br />2" <br />4" <br />Length of Piping Run: <br />Approx. 25' <br />Approx. 25' <br />Approx. 25' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of piping -run <br />isolation: <br />Test Boot <br />Test Boot <br />Test Boot <br />Wait Time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 Min <br />15 Min <br />Visual Fail <br />Test Start Time: <br />10:00 AM <br />10:00 AM <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />Test End Time: <br />11:00 AM <br />11:00 AM <br />Final Reading (Rf): <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (Rf - Ri): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />Test Result <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ® Fail <br />❑ Pass ❑ Fail <br />Comments include any information on repairs made prior to testing, and recommended follow-up for failed tests <br />*Vent failure due to cracked test boot. <br />