My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed by ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br />❑Other (Specify) <br />Test Method Used ®Pressure ❑ Vacuum ❑Hydrostatic <br />[]Other (Specify) <br />Test Equipment Used: 4" Liquid Gauge Equipment Resolution:. l <br />Piping Run # Piping Run # Piping Run # Piping Run # <br />Vnt/Rtn UE042UO01 <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />AO Smith <br />Piping Diameter: <br />4.0" <br />Length of Piping Run: <br />Approx. 25 Feet <br />Product Stored: <br />Diesel <br />Method and location of piping -run <br />isolation: <br />Test Boot <br />Wait Time between applying <br />pressure/vacuum/water and starting <br />test: <br />15 min <br />Test Start Time: <br />9:01 AM <br />Initial Reading (Ri): <br />5 PSI <br />Test End Time: <br />10:01 AM <br />Final Reading (Rf): <br />5 PSI <br />Test Duration: <br />1 Hour <br />Change in Reading (Rf - Ri): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />Test Result <br />®Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />Vent Line secondary test boot in fill sump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.