My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:21:17 PM
Creation date
6/3/2020 9:53:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231867_345 N SAN JOAQUIN_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental• <br />rl) East Main Street <br />Stockton,California95202-3029 <br />.......... I ; r s . <br />Phone: (209) 468-3420 <br />1' 464-0138 <br />DIRECTOR <br />Donna Heran, RENS <br />PROGRAM COORDINATORS <br />Robert htcClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kaley Foley, REHS <br />Unde Turkatte, RENS <br />&J.-il :J I :J I o [ell E -N r Mrmw <br />1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to <br />the applicant with comments. <br />2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location <br />of the tanks(s), piping, all tank -related appurtenances, streets, adjacent properties (north toward the top of the <br />page), nearby septic tanks, leachfields, water wells, buildings, underground public utility lines (including water, <br />sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are <br />not included on the site map, you must state in writing that USA Dig will be contacted prior to excavation <br />activities. <br />3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br />REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third party from the <br />contractor performing the work. Wo ®®v%� <br />tu <br />4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br />OWNER/OPERATOR of the facility. <br />5. Submit a completed "Service Request" form and "Underground Storage Tank Program Fee Worksheet". <br />V 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br />Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill <br />Excavation Certificate" is required by any incorporated areas (cities), submit to the appropriate City Building <br />Departments, pursuant to the Uniform Building Code STD 70-11. <br />Q jai 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed <br />plan. If gross deficiencies are identified, an addendum will be required with a $122.00 per hour fee and the <br />review will begin on the date of resubmittal. <br />o f, - 8. Advance inspection notice of at least 48 hours is required by the Environmental <br />Health Department (EHD). <br />440 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br />atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and <br />barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project <br />manager's responsibility for compliance with all health & safety regulations and requirements, including <br />confined space requirements, which shall be strictly adhered to at all times during the course of the <br />underground storage tank (UST) activities. <br />Pr 0. The EHD permit shall be on site during all UST permit -related activities. <br />!'1 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any <br />work must be described in detail on pages 3 & 4 and be shown on the detailed site map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.