Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: <br />QCheck this box if tank gauging is used only forF 1 <br />❑ Check this box if no tank gauging or SIR equipnidd i§"iiT§#aili Ao-r%RCh'T <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist. <br />E] Yes ❑ No* ��Ilas all input wiring been inspected for proper entry and termination, including testing for ground f cults? <br />.,�att,�..��,a=,awc�z <br />[:1Yes '� ❑ No* lWere all tank gauging probes visually inspected fordannage and residue buildup? <br />Pn­�....„w� „�,.„�.:q �� �. „�s.Fd..... , ;..w .........: .......:,,.., ,...., <br />❑ Yes Y, ❑ No* Was accuracy of system product level readings tested? <br />�,. ..,..., <br />❑ Yes ❑ No tIWas accuracy of system water level readings tested? <br />❑ Yes ❑ No*We re all probes reinstalled properly`' <br />v <br />❑ Yes No ere all items on the equipment manufacturers maintenance checklist completed? <br />* yW <br />*In the Section ti, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑ Yes❑ NO <br />For equipment start-upor annual e uipment certification, was a leak simulated to verify LLD performance?(Check <br />❑ N/Aa// <br />that apply) Simulated 1 eak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />,cf <br />El Yes El No* <br />W' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑Was <br />olEJ No* <br />the testing apparatus properly calibrated?Yes <br />❑ Yes ❑ No * <br />For mechanical L,LDs. does the LLD restri ct product flow if it detects <br />P _ a leak`? <br />❑ N/A <br />❑ Yes ❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes ❑ No* <br />For electronic LLDs. does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />❑ N/A <br />disconnected? <br />e_ <br />E] Yes ❑�No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ N/A <br />fai Is a test? E <br />.... * <br />❑ Yes ❑ No <br />_ g inspected? <br />For electronic LLDs, have all accessible wiring connections been visually <br />❑ N/A <br />❑Yes ❑ No* <br />Were all equipment on the egpment manufacturer's maintenance checklist completed? <br />ww�__._.- <br />* Inthe Section H, below, describe how and when these deficiencies were or willbecorrected <br />H. Comments: <br />Suction System. <br />