Laserfiche WebLink
n <br />AUG 2 8 Mh, January 2006 <br />Spill Bucket Testing Report For I_ <br />This form is intended for use by contractors performing annual testing of UST spill containmehttwattrta rer luted form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION Facilitv ID: UE042 <br />Facility Name: Pacific Bell Telephone Co dba ATT California Date of Testing: 2015/08/20 <br />Facility Address: 345 N. San Joaquin Stockton CA 95202 <br />Facility Contact: Thuy Tran I Phone: (209) 532-3447 <br />Date Local Agency Was Notified of Testing: 2015/08/13 <br />Name of Local Agency Inspector (if present during testing): Cindy Vo <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TAIT Environmental Services <br />Technician Conducting Test: Dan Luck <br />Credentials': ECSLB Contractor FICC Service Tech. ❑SWRCB Tank Tester [I Other (Specify) <br />License Number(s): A B ASB C-10 HAZ., 588098 ICC Service Tech #5252167 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: EHydrostatic []Vacuum []Other <br />Test Equipment Used: Tape Measure Equipment Resolution: 1/16" <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 UE0420001 <br />2 3 <br />4 <br />Bucket Installation Type: <br />❑Direct Bury <br />EContained in Sump <br />❑On Top of AST <br />❑Direct Bury ❑Direct Bury <br />❑Contained in Sump ❑Contained in Sump <br />❑On Top of AST []On Top of AST <br />[]Direct Bury <br />❑Contained in Sump <br />❑On Top of AST <br />Bucket Diameter: <br />11" <br />Bucket Depth: <br />14 1/4" <br />Wait time between applying <br />vacuum/water and start of test: <br />15 min <br />Test Start Time (Tj): <br />9:26 am <br />Initial Reading (Rj): <br />12 1/2" <br />Test End Time (TF): <br />10:26 am <br />Final Reading (RF): <br />12 1/2" <br />Test Duration (TF — Ti): <br />1 hour <br />Change in Reading (RF - RI): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result: <br />E Pass ❑Fail <br />❑ Pass ❑Fail ❑Pass ❑Fail <br />❑ Pass ` ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Test water returned to Tait shop. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />V" ZW41 Date: 2015/08/20 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />