My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 12:50:16 PM
Creation date
6/3/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19.1t Secondary container azar, double -walled tanks (includes interceptio <br />and detection systerz). tion 2633 (03 <br />A. Backfill in secondary container, (Section 2635 (c) 1-83 <br />B. Pore sx.-e of granular material used as backfill for primary container(s) complies %ith Section 2631 <br />(g). Mbineering data to support capacity requirement). <br />C. Two or more primary containers within secondary container. (include information on product <br />corutibility) <br />D. Secatiary container capable of precluding highest anticipated groundwater. <br />E. Secar ary container sloped to a monitoring sump from which leakage or precipitatian can be detected <br />and re=ved. <br />F. Water ;ir t corner which extends at least a foot beyond each boundary of the secondary container <br />exceva;ien, sloped to drain away from excavation. <br />Secondary container(s) thickness, density, composition, product compatibility. <br />Sized to contain uv: horized releases from primary containers to allow sufficient time for detection and removal. <br />[Section 2631 (c)] <br />21. Secondary container(s) volumetric requirements: (Section 2631 (e) (1) <br />and (2)3 <br />A. Single primary containers = 100%. <br />B. Multiple primary containers = 150% of largest primary container or 10% above aggregate. <br />22. Secondary container(s) open to rainfall. [ Section 2631 (f)3 <br />Volumetric retirements = 24 hours of 100 year storm in addition to primary container volumes. <br />23. N[� <br />X114- <br />24. <br />Secondary container floor. [Section 2631 (i)3 <br />A. Constructed on firm base. <br />B. Sloped to collection sump ( 1/8 inch per foot). <br />® Cl) One or more access casings installed in sump. <br />(a) Size to allow removal of collected liquid. <br />(b) Extended to ground surface. <br />CO Covered with a locked waterproof cap or <br />within a secured facility. <br />® (d) Thickness allows for anticipated stresses. <br />(e) Construction materials are not weakened stored product or will not donate, <br />capture, or mask constituents to be monitored. <br />Membrane liner specifications. (Section 2631; k, 1, and m3 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.