Laserfiche WebLink
n <br />n <br />New feces _' . e3 ulatfons require existing underground storage tanks <br />be upgrace 'o -eel the new requirements for spI and overflow <br />proiectic.don, all new underground storage tank installations <br />must comply upon installation . <br />Phff-fffe .EIIterprLses <br />Th <br />iIItrOdttCeS (heir �i�� e Phil --tile sump cover and spill collector <br />system meets or exceeds all federal regulations. <br />P -fife sump covet' & And, the unique design has been engineered to <br />Spill Co.feCtor trnf f provide maximum spill and overflow <br />protection through the use of (up to two) spill <br />collectors : �:d : o additional diamond plate lids, which seal and lock <br />in the as_ti.. ^`,r- <br />The unit ,;,oW,ts directly over the sump area for easy installation and <br />allows access to the riser cluster. The sump opening allows a AS 36" <br />diameter of de r, unobstructed area to fadUtate the removal of the <br />opLfOnalE,gh.~»&ght sump shield and access to the sump area. The <br />sump shied vi:;•, Vy eliminates all surface water from entering the <br />sump area andhas been designed to align with the sump coverlid. <br />The Phil--f?e unit is available in different configurations - <br />from bland top to as many as 4 openings <br />m any con. bination. In addition, lid <br />removal is r,;ade easy with the special <br />locking devices provided. <br />For more hfb=ation on the PhII-lite <br />sump cover and spM collector. <br />caU our Redding. CaBfornia <br />manufacturing office today: (916) 222-8015 <br />PAT NO.4,696,390 and other patenn applied for <br />