My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 12:50:16 PM
Creation date
6/3/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Total• <br />environrnental protection products f#' <br />your • •ary containment needs <br />Bulkhead Fittings <br />_ sae -ser Sumps and Pans <br />Guide Specifications <br />Short Form <br />The contractor shall provide .ne crv-oflex"` Double -Wall <br />piping system, as manufactu-e:: =y Total Containment, <br />Inc. Both the primary and seccn�a=+Ping systems shall <br />be installed and integrity tes:e� cordance with the <br />manufacturer's published ins --a!=- c -i instructions. <br />Long Form <br />Design: The Double -Wall Pip;n: Sys;em shall consist of <br />a UUULC listed flexible inner P- rrary pipe contained <br />within a ULC listed flexible outer containment pipe, each <br />making connection within a sees of surface access <br />containment chambers. All piai^_ runs shall be continu- <br />ous, whereby there shall be no `stings or piping con- <br />nections, for either the primal' or secondary contain- <br />ment pipe which are not visile or accessible from <br />aboveground. The secondary containment piping shall <br />be sized to allow complete removal of the primary piping <br />without excavation. The secondary containment system <br />shall provide watertight containment of the tank's piping <br />and its associated fittings, and the shear valve assembly <br />located below each aboveground fuel dispenser unit. <br />Product Compatibility. All the components of the <br />Double -Wall Piping System shall be compatible with the <br />products to be stored. <br />Corrosion Resistance: All components of the Double - <br />Wall Piping System shall be made of non -corrosive <br />materials, or if metallic, such as the fittings and cou- <br />plings, isolated from corrosion causing agents. <br />Liquid -tight Sump/Risers <br />Double-WallUnderg-� Z`%-896 <br />Tanks <br />Structural integrity: The outer secondary ment system shall be of such design and ms- '0 <br />to <br />have sufficient strength to withstand the n--s\.rnum <br />underground burial loads and tested in ac,=- =n'ce <br />with AASHTC M294. The flexible inner pnn` `' P'P- <br />ing system shall be capable of withstand:-', quid <br />pressure five times greater than the design&,: erat- <br />ing pressures. <br />Integrity Testing: The outer secondary cone_, n-^ent <br />systems shall undergo an air pressure hold gest i3 to <br />5 psi) after installation and before the fins[ <br />The flexible inner primary piping system shsli =-e sub- <br />ject to 60 psi air pressure hold test prior to `final tack - <br />fill. <br />Monitoring Capability. The design of the sz.•Un nary <br />containment system shall permit any leak in t^e pri- <br />mary piping system to be detected by a leak resection <br />system. <br />Access Chambers: Surface access containment <br />chambers shall be located at the tank containing the <br />tank's submersible pump and under each above- <br />ground fuel dispenser. These access charnilers shall <br />meet the following requirements: <br />1. Provide product -tight tank or island connection. <br />2. Provide product -tight pipe and conduit exits. <br />3. Provide sufficient strength to keep out <br />surrounding backfill material. <br />4. Made of non -corrosive, product compatible and <br />dielectric materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.