My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_1985-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 12:50:16 PM
Creation date
6/3/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1998
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_1985-1998.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />The primary purpose of this Site Health and Safety Plan is to <br />provide Aronson Engineering field personnel and Pacific Bell <br />field personnel with an understanding of the potential <br />chemical and physical hazards that exist or may arise while <br />the tasks of this underground gasoline storage tank removal <br />project are being performed. Secondarily, this information <br />defines the safety precautions necessary to respond to such <br />hazards. <br />A copy of this site health and safety plan will be on site at <br />all times® An additional copy will be kept and transported <br />along with any injured worker to the medical facility for use <br />by medical staff. <br />b. Objective <br />The objective of this health and safety plan is to ensure <br />the safety of all field personnel, and the surrounding <br />community. Accordingly, all personnel assigned to this <br />project will read and sign the acknowledgement statement at <br />the end of this plan, to certify that they have read, <br />understand and will abide by the health and safety plan. <br />A tailgate meeting will be conducted by the job <br />superintendent/site safety officer® No work will be <br />performed before this meeting has taken place® The tailgate <br />meeting will be conducted prior to each days <br />activities to review the following: <br />- location of the health and safety supplies on-site <br />- location of nearby telephones <br />® emergency procedures <br />- review procedures for working around heavy equipment <br />® establish exclusion zone <br />Any personnel who may need to enter an exclusion or <br />contamination zone must have completed an OSHA 40 hour <br />hazardous waste operations training® All visitors must <br />check in with the site safety officer. <br />IM <br />
The URL can be used to link to this page
Your browser does not support the video tag.