Laserfiche WebLink
r <br /> 8. a. Describe the method that will be utilized to purge and/or inert the tanks} <br /> Use dry ice to vapor free tank <br /> b. Tank/Piping Hauler: <br /> Name EC I <br /> Address 255 Parr Boulevard CitY.zi rhmnna_ ZIP Q4801 <br /> Phone No.( 51 0 ) 235-3709 <br /> Hauler Registration f(if hauled as hazardous) CAD 9 8 2 0 3 01 7 3 <br /> C. Tank/Piping Disposal Site: <br /> Name ECI <br /> Address 255 Parr Boulevard CityRichmond ZIP 94801 <br /> Phone No.( 510 )235-1393 <br /> SPA D}#(if transported to a permitted TSD facility)CAD 0 0 9 4 6 6 3 0 2 <br /> 9. Is the sampling firm an independent third party from the contractor? YES)( NO[I <br /> 9a. Describe,in detail,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> DecontaminatedL equ nl_q t a�rl cnn±a i ner wi 1 1 be used -SQ-4 -1 >; _ I be <br /> collected in brass sleeves with plastic end c psaround cater will <br /> be filled using disposable bailers Brass sleeves will he _filled <br /> using sample 60R+461 device with attached slide hammer. <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal.- <br /> Rea gravel 3/8" <br /> neminal diameter <br /> 11. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> Vi squeQn- <br /> b)What will be the final destination of the excavated stockpile? <br /> Forwarrl l anrlf i l l J - StoG rtQn, if petroleum impacted. <br /> c)Contaminated Soil Hazardous Waste Hauler: <br /> Name ECI Hauler Registration <br /> Address 255 Par Boulevard CltYu; r Inmr nra ZIps"488)'.- - <br /> Phone No.( 51 0 ) 253=-17n* <br /> - <br /> EH 23 046(Revised 08113199) Page 5 <br />