Laserfiche WebLink
SECONDARY PIPE TESTING • <br /> Test Method Developed By: ®Piping Manufacturer ® Industry Standard p Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Uses: ®Pressure p Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Measuring Equipment Used for Testing: Digital manometer <br /> Piping Run#SUPPLY Piping Run#SUPPLY Piping Run# <br /> Piping Material: PLASTIC PLASTIC <br /> Piping Manufacturer: WESTERN WESTERN <br /> Piping Diameter: %/I 1 K <br /> Length of Piping Run: 30' 30' <br /> Product Stored: DIESEL DIESEL <br /> Method and location of TEST BOOT TEST BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES <br /> starting test: <br /> Test Start Time: 10:40 10:40 <br /> Initial Reading(RI): 5 PSI 5 PSI <br /> Test End Time: 11:40 11:40 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I HOUR 1 HOUR <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold: 0 0 <br /> Test Result: <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained for the repairs) <br /> Note: Pressure testing of piping secondary containment systems should be performed at 5 PSI, <br /> which is generally consistent with testing performed at time of installation. <br /> R.C.U.S.T.COM <br />