Laserfiche WebLink
UE058 <br /> BUSINESS NAME(Same as FACILITY NAME or DBA-Doing Business As) 3 <br /> Pacific Bell Telephone Company dba AT&T California UE058 <br /> BUSINESS SITE ADDRESS 103 CITY 104 <br /> 10 E 12TH ST TRACY <br /> Revised 7/5/2012 <br /> Monitoring Plan Chane History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 7/22/2008 Section V: Added Monthly Visual Pipe Monitoring; Section X: Added Overfill Alarm, Revised Gen Room Floor Sensor <br /> Model#;Section XI:Replaced ESM with Vendor <br /> 7/25/2008 Section X:Removed Overfill Alarm <br /> 5/14/2009 Section VIII:Added Visual Inspection Records; Section X:Added Overfill Alarm <br /> 9/21/2009 Section X:Added Fill Tube Shut-Off Valve as Primary Overfill Prevention Device <br /> 7/5/2012 Section IV & V: Specified TLS Model #; Sections IV, V & X: Specified Sensor Locations; Section XI: Offered Vendor <br /> Contact List Upon Request <br /> Response Plan Chan e History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 7/22/2008 Removed Shaw from Section III and Added ESM to Section IV <br /> 4/18/2010 Updated to latest UniDocs form <br /> 7/5/2012 Updated to latest UniDocs form;Section IV:Offered Employee Contact List Upon Request <br /> Facility Information Form Change History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 7/22/2008 Section IV:Revised Tank Owner Info to Dallas address;Section VI:Revised Permit Holder Info to Tank Owner <br /> 7/5/2012 Section VI:Revised Permit Holder Info to Facility Owner <br /> Tank Information Form Change History <br /> Revision Date Reason for Revision <br /> 6/3/2008 Revised to new UniDocs forms <br /> 5/14/2009 Section ll:Updated Tank ID#;Section VIII:Added Isolation <br /> 6/9/2009 Section III:Changed Fuel Usage from Other to Emergency Generator <br /> 9/21/2009 Section IV:Added Fill Tube Shut-Off Valve <br /> 3/26/2010 Section VI:Added Vent Secondary Fiberglass <br /> 7/5/2012 Section II:Revised Tank Install Date;Section VI:Revised Vent Primary Piping Material to Steel <br /> Site Plan Change story <br /> Revision Date Reason for Revision <br /> 8/28/2007 Stantec Site Plan <br /> 7/22/2008 Revised Stantec Site Plan <br /> 5/14/2009 New Site Plan created <br /> 7/5/2012 Added Tank ID#(s),Sensor Locations,ATG, Spill Bucket,Generator&AG Piping;Relocated Generator Enclosure inside <br /> building walls <br />