Laserfiche WebLink
Monitoring System Certification <br /> Address: 10 E. 12TH ST, TRACY 95376 Service Date: 05/25/2010 <br /> UST monitoring Site Pian <br /> at&t Monitoring Plan Site Map <br /> Drawing NOT to Scale <br /> Business Name, Pacific Bell Telephone Co, dba AT&T Cal. (UE058) <br /> 12th Street <br /> A <br /> a <br /> .` Annu{ar Sensor 9�m <br /> Fil Sump w( <br /> Sensor <br /> Pgrrg sump wt <br /> AT&T building 10KUST D," t Sensor <br /> Y <br /> t Fuel tunas <br /> j <br /> vent Fuse. <br /> .,� OrwM Germ i <br /> cmavcs.. — macre+ — �p �1 Floor <br /> TLS 350 ;1 - Sen9or <br /> on tAt <br /> Aoor <br /> .... _ ......wce�:mxtvrvsEersxmcr...:a'.zr..+a>�sw^.ara-:umvcn:;.moversas�ov>u�.mzJ <br /> N <br /> w.4 r: <br /> S <br /> Date map was drawn: 05/25/2010 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment <br /> areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). <br /> In the space provided, note the date this Site Plan was inspected. <br /> Monitoring System Certification Page 4 of 4 17107 <br />