My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Check work order. Route, Name, and address of closest medical center for each site is to be included <br />in each sites work order. Medical Center information shall be placed on the dash board of the work <br />truck while onsite for access in case of emergency <br />I:[4171kIf_lCZ• <br />See above. <br />On-site personnel will use the following standard emergency procedures. The SSHO shall be <br />notified of any on-site emergencies and be responsible for ensuring that the appropriate <br />procedures are followed. <br />PERSONNEL INJURY: <br />Upon notification of an injury, the SSHO will assess the nature of the injury. If the cause of <br />the injury does not affect the performance of site personnel, operations may continue, with <br />the appropriate on-site field personnel initiating the appropriate First -Aid and necessary follow- <br />up. If the injury increases the risk to others, all field personnel shall be moved to a safe <br />location until further instructions. <br />Activities on site will stop until the added risk is removed or minimized. <br />In the event of a fire or explosion on site, the Fire Department well be summoned. All site <br />personnel shall assemble at "rally point" a safe distance from the involved area. <br />If any site worker experiences a failure or alteration of protective equipment that effects the <br />protection factor, that person shall immediately stop that particular work activity and repair or <br />replace the failure. Should the failure of the personal protection equipment be unrepairable, <br />and then that worker will stop that work activity and report the failure to the SSHO. That site <br />worker will be reassigned to other work activity not requiring that particular PPE and shall not <br />be permitted to allowed to continue the previous work activity until the equipment has been <br />repaired or replaced. <br />i • ' <br />11/07/2005 revision 5 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.