Laserfiche WebLink
SWRCB, JaM2%002k <br />Page of <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />FaSjli" blot Equ!pped With Spill/Overfill Containment Boxes 0 <br />Spill/Overfill Containment Boxes are Present, but were Not Tested 0 <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer <br />0 Other (Specify) <br />.Industry Standard 0 Professional Engineer <br />Test Method Used: <br />0 Pressure <br />0 Other (Specify) <br />0 Vacuum )<'Hydrostatic <br />Test Equipment Used: <br />Bucket Diameter: <br />e7 1-14 Equipment Resolution: /J <br />Spill Box# Spill Box -# Spill Box # Spill Box # <br />Bucket Depth: <br />-Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />AW, <br />Initial Reading (RI): <br />-/'. <br />Test End Time: <br />A "4T <br />Final Reading (RF): <br />-16, /7Wf!!$ <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />eass 0 Fail 0 Pass <br />0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Pb ,4:: <br />