Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-545 <br /> arra•5ah <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ®4.NO DISPENSERS ❑99.OTHER(Specify): <br /> ------------------------ ----- <br /> - - - - --- -- - - ------­­--­------------- <br /> PANEL MANUFACTURER: _ tom'`-- -MODEL-- 'a'`6 <br /> LEAK SENSOR MANUFACTURER: 490.57 1 MODEL k(S): 490.58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE.AND VISUAL ALARMS ❑ a.YES ❑b.NO 490 s) <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑K NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑_ a.YES ❑b.NO 440.62 <br /> 2.UDC CONSTRUCTION IS ❑L SINGLE-WALLED ❑2.DOUBLE-WALLED 490-a) <br /> IF DOUBLE WALLED: 49Y61a <br /> _UDL INTERSTITIAL SPACE..IS MONITORED BY: El LIQUID El 2.PRESSURE 0 3.VACUUM — <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT'OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b NO 440-64b <br /> . VII.PERIODIC SYSTEM TESTING <br /> (J l ELU'I'ES'1'INC: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> — LEA DE" .CTION MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.j23 CCR X2644 I) _ <br /> ®2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> ----_... <br /> -...... <br /> -----......-— ---- _ - - - ---- ------ ------- - -- ---- - - -- -- <br /> ®3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490.68a ❑Visual Inspection Records 490-68b ❑Tank integrity testing results 49"Sc <br /> ❑SIR testing results(and supporting documentation records). 490-6ed ❑ Tank gauging results(and supporting documentation records). 490-6se <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-688 <br /> ®Equipment maintenance and calibration records. 490.68h <br /> IX.TRAINING ---- <br /> ®Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69A <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-699 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GANGING SYSTEMS"490-698 <br /> ❑ O.1'HER(Specify):M69h,M691 <br /> ®This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> Y The facility employee's role with regard to the monitoring equipment as specified in this LIST Monitoring Plan <br /> A The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> S Names of contact person(s)for emergencies and monitoring alarms.490.70 <br /> X. COMMENTS/ADDITIONAL INFORMATION _ <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.440.71 <br /> Fill Sump Sensor-794380-208,Generator Room Floor Sensor-794380-322 <br /> _ XL PERSONNEL RESPONSIBILITIES _ <br /> The UST Owner/Operator is responsible for ensuring that: I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME Connie Mitchell 440.72 TITLE EM Site Manager 490-73 <br /> NAME AT&T Environment Health&Safety 490-74 TITLE Call Center 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> TX1L OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT <br /> SIGNATURE 490-76 DATE: <br /> 490-77 <br /> June 3,2008 <br /> REPEFM N 1 7'. O 2. <br /> ve r <br /> APPLICANT NAME(print): 490.78 APPLICANTTITLE: 490.79 <br /> Steven J.Hall Manager, EH&S <br /> U PCF UST-D(12/2007) <br />