My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
10
>
2300 - Underground Storage Tank Program
>
PR0231873
>
COMPLIANCE INFO_2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:30:35 PM
Creation date
6/3/2020 9:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231873
PE
2361
FACILITY_ID
FA0003956
FACILITY_NAME
PACIFIC BELL - UE058 (TRACY)
STREET_NUMBER
10
Direction
E
STREET_NAME
12TH
STREET_TYPE
St
City
TRACY
Zip
95376
APN
23336922
CURRENT_STATUS
01
SITE_LOCATION
10 E 12TH St
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231873_10 E 12TH_2007-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI.DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mw. <br /> ❑ I.CONTINUOUS ELECTRONI('MONITORING OF UNDER DISPF.NSER CON'rAINMENT(UDC) <br /> PANEL MANUFACTURER: M L MODEL#: M52. <br /> LEAK SENSOR MANUFACTURER: MGI' MODEL#(S): M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Msz <br /> ❑ 2.MECHANICAL CONTINUOUS MONITORING(e.g.,FLOAT AND CHAIN ASSEMBLY)N UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> MANUFACTURER: M58. MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY M60. <br /> ® 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST PERFORM ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD 1S PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. T NING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) MRO. <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD(SWRCB)PUBLICATION:"HANDBOOK FOR TANK OWNERS-MANUAL AND STATISTICAL <br /> INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): MRI <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005,this facility will have a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code <br /> Council(ICC). By July 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST <br /> systems.This training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> A The facility employee's role with regard to spills and overfills. <br /> A Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFO TION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): MRs. <br /> SB989 secondary containment testing every 36 months <br /> Spill buckets are tested annually <br /> Generator room floor sensor, 794380-322 <br /> Overfill Prevention: External Alarm set at 90%and fill tube shut off valve set at 95% <br /> The Veeder Root alarm panel is remotely monitored 24-hours a day by AT&T. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF JANUARY 1,2005,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILiTY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN TITLE 23 CCR§2715(c),AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE <br /> FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR '2715(c). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:i certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATURE REPRESENTING DATE: Mgt. <br /> ®Owner M9o. <br /> ❑Operator September 13,2007 <br /> OWN PERATOR NAME(print): M92. OWNERIOPERATOR TITLE: Myr <br /> Jason D.Weller Manager,EMS <br /> (Agency Use Only) his plan has ,en r viewed and: Approved ❑Approved With Conditions g❑Disapproved <br /> Local Agency Signature: ? 'S U4 Date: ! ` <br /> Comments/Special Conditions: <br /> hwfwre-d(9/24/04)-3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.