My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> UST SYSTEM DRAWING INFORMATION <br /> 1, Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2, / Plans drawn to scale in non-erasable print. <br /> 3, ,v` Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. Tank cross-sectional diagram_ <br /> 6, Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> g, Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)7 <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility- [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)I <br /> 12. TANK COMPOSITION <br /> TANK 9 / I <br /> CAPACITY �a(� (��� O �',d evla <br /> MANUFACtURER <br /> COMPOSITION U ✓`% %7� ��L L <br /> MODEL �G 41— ✓' 7__ <br /> PRODUCT ��5 �T ✓ 4I � <br /> CORROSION PROTECTION o !9 <br /> U.L. LISTED PS e'� �> <br /> COMPATIBILITY WITH 100%. Lp <br /> METHANOL <br /> 13T ) TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> _ (2) Vacuum applied to interstitial space. <br /> XejB. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank [Section 2635 (a) (2) (A)I <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist- <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.