My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2023 11:23:59 AM
Creation date
6/3/2020 9:54:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_1998-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19, Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A>- Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow to tank CSection 2635 (b) (2) (B) or (C)), or <br /> V Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)l, or <br /> {g) Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)) <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) 6,Z Underground primary piping will meet all. of the following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of: ondarypipeVault or <br /> _lined trench to be sloped to a collection sump at the low point of the pi _ping. <br /> _ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> {F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> Automatic line leak detectors will be installed on pressurized pipingA . <br /> Manufacturer: Model: <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. Jq <br /> / Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> fails or is disconnected. <br /> 20. tate Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. �)1 <br /> 22. -,.,,—�What is the approximate depth to ground water: U I <br /> (include source of information - borehole logs, d6nitoring well data, water <br /> studies, etc.) 2 <br /> 23. Total number of tanks on site after installation: <br /> 24. County/City Fire District and Building Department notified. <br /> 25. _ In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility lin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements) as an owner or operator to submit a workplan to PHS-END Site Mitigation Unit prior to initiating any <br /> assessment or remed'a ion activities. For further assistance contact the Site Mitigation unit at (209) 469-3450. <br /> The owner or opera r acknowledge this responsib'/ity for work <br /> p <br /> lan submittal by signature and date below. <br /> 3 <br /> Na Title 1J7�✓��� Date <br /> CONDITIONS OF APPROVAL: <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.