Laserfiche WebLink
08/1412012 20:38 (209)465-4988 MaryAnn Henderson Page 14/19 <br /> 0 <br /> SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used:NITROGEN Equipment Resolution:PSI <br /> Piping Run#REG Piping Run#SUPER Piping Run#DIES Piping Run# <br /> Piping Material: FIBER FIBER FIBER <br /> Piping Manufacturer UNK UNK UNK <br /> Piping Diameter: 3" T' 3" <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: GASOLINE GASOLINE GASOLINE <br /> Method and location of BOOTED/SUMPS BOOTED/SUMPS BOOTED/SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1200 1300 <br /> Initial Reading(Rj): 4 PSI 4 PSI <br /> Test End Time: 1300 1400 <br /> Final Reading(RF): 4 PSI 4 PSI <br /> Test Duration: I HR. I HR. <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or <br /> 0 0 <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail X Pass 0 Fall X Pass ❑Fad ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Regular Secondary Line not tested. <br />