My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_2004-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 4:32:43 PM
Creation date
6/3/2020 9:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2012
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_2004-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08/1412012 20:38 (209)465-4988 MaryAnn Henderson Page 14/19 <br /> 0 <br /> SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used:NITROGEN Equipment Resolution:PSI <br /> Piping Run#REG Piping Run#SUPER Piping Run#DIES Piping Run# <br /> Piping Material: FIBER FIBER FIBER <br /> Piping Manufacturer UNK UNK UNK <br /> Piping Diameter: 3" T' 3" <br /> Length of Piping Run: 200' 200' 200' <br /> Product Stored: GASOLINE GASOLINE GASOLINE <br /> Method and location of BOOTED/SUMPS BOOTED/SUMPS BOOTED/SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1200 1300 <br /> Initial Reading(Rj): 4 PSI 4 PSI <br /> Test End Time: 1300 1400 <br /> Final Reading(RF): 4 PSI 4 PSI <br /> Test Duration: I HR. I HR. <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or <br /> 0 0 <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail X Pass 0 Fall X Pass ❑Fad ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Regular Secondary Line not tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.