Laserfiche WebLink
08/1412012 20:38 (209)465-4988 MaryAnn Henderson Page 18119 <br /> SWRCB,January 2002 Page_of_ <br /> 9. SPIOLIJOVERFELL CONTAEOUNT BOXES <br /> Faci ity is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer X Industry Standard 0 Professional Engineer <br /> ❑Other(Specie) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Water,Tape Measure Equipment Resolution: <br /> Spill Box#Regular Spill Box#Premium Spill Box#Diesel Spill Box# <br /> Bucket Diameter: 12 12 12 <br /> Bucket Depth: 121/2 141/2 141/2 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN 5 MIN 5 MIN <br /> starting test: <br /> Test Start Time: 0900 0900 0900 <br /> Initial Reading(Rj): 11 1/2 13 1/4 133/4 <br /> Test End Time: 1000 1000 1000 <br /> Final Reading(RF): 11 1/2 13 1/4 133/4 <br /> Test Duration: 1 HR I HR 1 HR <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) <br />