Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used:NITROGEN Equipment Resolution:PSI <br /> MEM <br /> Piping Run#91 Piping Run# Piping Run# Piping Run# <br /> Piping Material: FIBERGLASS <br /> Piping Manufacturer: SMITH <br /> Piping Diameter: 3" <br /> Length of Piping Run: 150' <br /> Product Stored: FUEL <br /> Method and location of BOOTED,SUMPS <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> stamp test: <br /> Test Start Time: 1030 <br /> Initial Reading(RI): 3 PSI <br /> Test End Time: 1130 <br /> Final Reading(RF): 3 PSI <br /> Test Duration: I HR <br /> Change in Reading(RF-Rt): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: Pass ❑Fail ❑ Pass €,Fail ❑ Pass . ❑Fail ❑ Pass ❑,Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />