Laserfiche WebLink
r UNDERGROUND STORAGE T <br /> SPONSE P -PAGE 1 ;(One facility) <br /> TYPE OF ACTION 1.NEW PLAN 2.CHANGE OF INFORMATION Rot. <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) 1. <br /> BUSINESS NAME(Same as FACIL NAME) 3. <br /> BUSINESS SITE ADDRESS 103. 1 BUS SS S E CITY 104• <br /> ec CA <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> A If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> A Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the seroma <br /> contain the us ,but not ter than 30 calendar da or soon if secondary containment system to <br /> gree days, by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> • Absorbent material will be used to contain and cleats up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be unaged as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 fords that <br /> it is non-hazardous. Used absorbent material.,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> • Facility personnel will determine whether any water removed from secondary containment system,or from clean-up activity, has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 fords that it is nom-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> A We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary contrunment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> . SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODICMAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SInTF,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if a licable <br /> EQUIPMENT LOCATION AVARABILfrY <br /> RIO. R20. R30. <br /> R11. R21. R31. <br /> R12. R22. R32. <br /> R13. R23. R33. <br /> R14. R24. R34. <br /> R15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME RQ. TITLE R50. <br /> ran Oki 11nn <br /> owl ILJ <br /> NAME R4 I. TITLE R5 1. <br /> NAME R42. TITLE R52. <br /> NAME R43. TITLE R53. <br /> V. MONITORING ICATO <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑1. ADDMONAL SYSTEM TESTING OR DATA COLLECTION 2. INSPECTION BY QUAUFEED PERSONS ❑3. RECALIBRATION OF EQUIPMENT R60. <br /> ®93. OTHER(Specify): R61. <br /> UN4122B-1/3 www.nnd org Rev.04/02= <br />