Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer L�-Tndustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 2 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: NITROGEN Equipment Resolution:PSI <br /> i Piping Run#91 Piping Run# Piping.Run# Piping Run# <br /> i . <br /> Piping Me.terial: FIBERGLASS <br /> Piping Manufacturer: SMITH <br /> Piping Di;.meter: 3" <br /> Length of Piping Run: 150' <br /> Product Stored: GAS <br /> Method and location of BOOTED,SUMPS <br /> i in -rm-,isolation: <br /> Waittime between applying <br /> pressure/hiacuum/water and 2 HRS <br /> starting test: <br /> Test Start Time: 1000 <br /> Initial Reading(Ri): 3psi <br /> Test End Time: 1100 <br /> Final Re<<ding(Rr): 3psi <br /> Test Dur.tion: 1 hr <br /> Change in Reading(RF-Rj): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: 4rPass ❑Fail ❑ Pass ❑Fait ❑ Pass ❑Fail L11 Pass ❑Fail <br /> Comxn(IIts—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Had prr:ssure on lines entire time backfilling and pouring concrete. Started test after concrete poured. <br />