Laserfiche WebLink
v - I <br /> SWRCB,January 2002 • Page 2 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer &Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: NITROGEN Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#91 Piping Run#DSL Piping Run# <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: SMITH SMITH SMITH <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: 150' 150' 100' <br /> Product Stored: FUEL FUEL FUEL <br /> Method and location of BOOTED, SUMP BOOTED,SUMP BOOL ED,SUMP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1026 1225 0900 <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 1126 1325 1000 <br /> Final Reading(RF): 5 PSI 2.5 PSI 5 PSI <br /> Test Duration: I HR I HR I HR <br /> Change in Reading(RF-RI): 0 2.5 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: .fid Pass ❑Fail ❑ Pass XFail It Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />