Laserfiche WebLink
SWRCB,January 2002 • Page 3 of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer &Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum N Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON TS STS Equipment Resolution: .0001" <br /> Sump#87 Sump#91 Sump#DSL Sump# <br /> Sump Diameter: 42 42 42 <br /> Sump Depth: 40 40 40 <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 12" 12" 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12" 12" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: GOOD GOOD GOOD <br /> Portion of Sump Tested' 14" 14" 14" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No If NA ❑Yes ❑No SNA ❑Yes ❑No .SNA ❑Yes ❑No ❑NA <br /> product and water)?` <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑Yes ❑No 4 NA ❑Yes ❑No ANA ❑Yes ❑No SNA ❑Yes ❑No ❑NA <br /> shutdown?* <br /> Was fail-sae verified to be ❑Yes El No RNA ❑Yes ❑No .SNA 11Yes ❑No .CRNA 11Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN 5 MIN 5 MIN <br /> test: <br /> Test Start Time: 1320 1320 0951 <br /> Initial Reading(RI): 6.7555 1.0399 0.6517 <br /> Test End Time: 1335 1335 1006 <br /> Final Reading(RF): 6.7565 0.9597 0.6510 <br /> Test Duration: 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-RI): 0.0010 0.0802 0.0007 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.01 <br /> Test Result: J' Pass ❑Fail ❑ Pass ,.Fail AB Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? VYes ❑No ❑NA 4 Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and Yes ❑No ❑NA 9-Yes ❑No ❑NA RYes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />