My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1001
>
2300 - Underground Storage Tank Program
>
PR0231876
>
COMPLIANCE INFO_2004-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 4:32:43 PM
Creation date
6/3/2020 9:54:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2012
RECORD_ID
PR0231876
PE
2361
FACILITY_ID
FA0000421
FACILITY_NAME
DINO MART
STREET_NUMBER
1001
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1001 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231876_1001 E YOSEMITE_2004-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Andustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum 'Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: INCON TS STS Equipment Resolution: .000 1 INCHES <br /> W777= sm, <br /> UDC# 1-2 UDC#3-4 UDC#5-6 UDC#7-8 <br /> UDC Manufacturer: BRAVO BRAVO BRAVO BRAVO <br /> UDC Material: STEEL STEEL STEEL STEEL <br /> UDC Depth: 10 10 10 10 <br /> Height from UDC Bottom to Top 0 0 0 0 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 0 0 0 0 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to GOOD GOOD GOOD GOOD <br /> testing: <br /> Portion of UDC Tested 3" 3" 3" 3" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No C3 NA 11 Yes ❑No ?NA ❑Yes ❑No C�lA ❑Yes []No A <br /> product and water)? <br /> Turbine shutdown response time <br /> Is system programmed for fail- 11 Yes ❑No IKNA ❑Yes ❑No XA ❑Yes ❑No 2�1A ❑Yes ❑No ?<A <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No [AA ❑Yes ❑No [IA ❑Yes ❑No ? A ❑Yes ❑No A <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 11:02 11:02 12:03 12:03 <br /> Initial Reading(Rj): 0.3388 0.1434 0.7301 0.2366 <br /> Test End Time: 11:17 11:17 12:18 12:18 <br /> Final Reading(RF): 0.3382 0.1433 0.7287 0.2367 <br /> Test Duration: 15 MIN 15 MIN 15 min 15 min <br /> Change in Reading(RF-RI): 0.0006 0.0001 0.0014 0.0001 <br /> Pass/Fail Threshold or Criteria: .002 .002 .002 .002 <br /> Test Result: 2Pass ❑Fail Er Pass ❑Fail [R-Pass ❑Fail IT-Pass ❑Fail <br /> Was sensor removed for testing? 1-Yes ❑No ❑NA Z Yes ❑No ❑NA Aes ❑No ❑NA C'Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? A� es LEINo �NA [2'Yes 11 No ❑NA [ln_. 11 No ❑NA fifes ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to�Lny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.