Laserfiche WebLink
Quick STOP Mart 2095254569 p.4 <br /> UNDERGROUND STORAGE TANK <br /> SPONSE PL —PAGE I (One forst per facility) <br /> TYPEOF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Rot. <br /> I. FACIlGITY fl TION <br /> FACIL-I I ID 0 (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> + , �,.t.,. p � Roz <br /> BUSINESS STTE ADDRESS V 1 u R03. CITY <br /> t R04. <br /> ( <br /> IF. SPILL CONTROL AND CLEANUp METHODS <br /> This P3 addresses unauthorized releases from UST systems and supplernenCc the emergency response plans and procedures in the faa7ily's Hazardous Materials <br /> Business Plan <br /> q If safe to do s4.facility personnel will take immediate measures to control or stop any release(e.g.,activat6 pumpshut-oft etc.)and,if necessary,safely romave <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain The hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless stul suitable <br /> for their intended use,wil l be managed as hazardous waste, <br /> D Absorbent material will be used to contain and clears up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR W2b2_1 I finds that <br /> it is non hazardous. Used absorbent material, reusable or caste,will be stored in a properly labeled and sealed.CAntsrinPr, <br /> appropriately. Waste material shall be disposed <br /> F Facility personnel will determine whether any water removed from secondary containment sysrents,or from clean-up activity,has been in connect with any <br /> lutwirdous material.Wthe water is contaminated,it will be managed as hazardous waste unless a gases determination in accordance with been <br /> CCR¢66262.11 finds <br /> that it is torr hazardous. It site water F>aa a petroleum slreea(i e.,rainbow colars),it is contantinsted_A thick floating p�rvleum layer may not necessarily display <br /> ramboW colors. Water(hazardous or non-haz udots)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> » We Will review secondary containment systems for possible deterioration ifany afthe following conditions oeem: <br /> 2. Secondary <br /> azs material in contact with secondary containment is not eompata'ble with tate material used for secondary containment <br /> cry containment is prone to damage from any equipment used to remove or clean up hazardous material collect in recon <br /> 3, Hazardous material,other than the produettwaste stored in the dary containment; <br /> released product/waste,and the added material or resulting material from dation isnot comms bli with secone econdary dary <br /> to treat or neutralize <br /> dary containment <br /> III SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MA MNANCIE:Spill control and dean-up egtdpanent kept peorgmendy--siW is listed in the facility's Hazardous Materials Business Plea. This <br /> equipment is inspected at least monddy,and after each use,supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> E URVAENT NOT PERMANEMMY ON-srM BUT AVAILABLE FOR USE IF NEEDED: (CLmMleta onI if treble <br /> EQUIPMENTLOCATI N AVAILABILITY <br /> Rio. R2o. <br /> Tt3u <br /> FU 1. R21. <br /> R31. <br /> RIZ R2t <br /> R32. <br /> R 13. <br /> PM. R33. <br /> R14. R24. J134. <br /> RIs. 125. <br /> n� R34. <br /> IV. RESPONSIBLE PERSONS <br /> TAE FOLLOWING PERSONN ISIAR.E RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS R,)~SPON$E PLAN: <br /> NAM I � eRan TITLE <br /> tt5a. <br /> NAMECJl4�. <br /> R4E. TITLE <br /> Rsn. <br /> NAME Roz TITTLE <br /> Pet <br /> NAME R43. TITLE R53. <br /> V. MONITO G MICATORS <br /> IF MONrroitm INDICATES A POSSIBLEUNIAMORIZED RELEASE„STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> O Additional system testing or data col leWon ❑Inspection by Mialified persons O Recalr73ration of equipment <br /> Other. <br /> Rea, <br /> JUST Response Ptah )-V3 <br />