Laserfiche WebLink
SWRCB„January 2002 Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer Andustry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: }Pressure ❑ Vacuum ❑ hydrostatic <br />❑ Other (Spec) <br />Test Equipment. Used: Equipment Resolution: <br />Piping Run # Piping Run #Q Piping Run # ” Piping Run # <br />Piping Material: <br />Piping Manufacturer: <br />(� <br />4. j <br />Piping Diameter: <br />'� <br />a <br />Length of Piping Run: <br />r <br />.� <br />Product Stored: <br />l v \ <br />Method and location of <br />G <br />i in -riui isolation: <br />8 5,16, <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Da -u <br />t to'aDa <br />Initial Reading (Pi): <br />Test End Time: <br />,,,, i ' <br />Final Reading (Rr): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass 4 Fail <br />❑ Pass Fail ❑ Pass Fad <br />❑ Pass ❑ Fail <br />