Laserfiche WebLink
gct4! <br /> �o. �.coG SAN JOAQUIN COUNTY 16 <br /> z _r ENVIRONMENTAL HEALTH DEPARTMENT <br /> •,Z <br /> y 1868 East Hazelton Avenue, Stockton,CA 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sj oq v_org/ehd <br /> /FORS <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> Manteca Valero Wednesday, November 28, 2012 <br /> Facility Address: Service Request#: <br /> 1001 Yosemite Avenue, Manteca SR0065906 <br /> Onsite Service Technician's Name: ICC Service Technician/Installer Exp.Date: Manufacturer Training: <br /> Jarod Burke 110/10/14 Smith piping 9/13/14 <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model: <br /> ❑ <br /> 11 electronic Serial#: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model: <br /> ❑ ❑electronic Serial#: ❑ ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> sensor <br /> ❑ ❑ positive shutdown Model: ❑ Primaps piping testing at: <br /> ❑fail safe Serial#: minutes <br /> ❑ NA <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Clamp on Piping <br /> ❑fail safe Serial#: 87 turbine Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑positive shutdown Model: 05/28/2013 <br /> ❑fail safe Serial#: Note: Please be aware that 21 containment components are required to be tested upon <br /> ❑ NA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> EDDrop tube with mechanical overfill at 95% ElCorrosion protection <br /> Overfill prevention(see LG letter 150-1) ❑ Other: see below <br /> 0 This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> Witnessed soap test performed on the 87 secondary piping, a lake test on the 87 turbine sump, and a <br /> pressure test of 4 psi performed on the 87 secondary piping. All passed. <br /> As per the technician the primary piping was not cut but the secondary pipe was just slide out enough <br /> to have the test boot fit for the secondary testing. <br /> Technician performed a coldwell test on the 87 turbine sump in lieu of the 24 hour lake test. Used <br /> existing penetration and secondary piping. <br /> A secondary containment testing must be performed on the tank once the facility is in operating <br /> condition. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector- 1 R ii By: Title: <br /> Ail ' C'�! <br /> EHD 23-04 Rev.04/19/12 UST SERVICE REQUEST INSPECTION REPORT <br />