Laserfiche WebLink
` F. In -Tank Gauging I SIR Equipment: ❑ Check this box if tank gaug used only for inventory control. <br />❑ Check this box if no tank gauging or SIR eqi ment-is installed_ <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. L - <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? V MCI <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? - yap 4� <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? m <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comnlata tha fniinwinn rharkliat- <br />® Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ N/A <br />Simulated leak rate: ® 3 g.p.h.; [10.1 g.p.h ; [10.2 g.p.h. <br />® Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturers maintenance checklist completed? <br />in aecaon m, oeiow, oescrioe now ano wnen mese aenclencles were or wnl oe correcrea. <br />. <br />H. Comments: <br />87 120 3 24 21 PASS <br />91 130 3 26 21 PASS <br />DSL 140 3 30 23 PASS <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />